国际油气管道EPC项目分包合同进度结算管理
The Progress and Settlement Management of International EPC Project Subcontract
DOI: 10.12677/JOGT.2019.412026, PDF,   
作者: 李贻浩, 阳 龙:中国石油管道局工程有限公司国际事业部,河北 廊坊
关键词: EPC分包商进度结算EPC Subcontractor Progress Settlement
摘要: 在海外EPC (engineering procurement construction)项目中,对分包商的管控关系着项目的成败,其中对分包合同进度估算的管理是重中之重。针对国际油气管道EPC项目,从进度结算申请、最终结算、进度结算支付3个方当面阐述了对分包合同进度结算的管理。
Abstract: In the overseas EPC (engineering procurement construction) project, the management and control of the project subcontracting was related to success of the project. The first important work was the management of progress estimate of subcontractor. Based on the EPC project of international oil and gas pipeline, the management of progress and settlement of the subcontractors are denoted from the aspects of the progress and settlement and application, final settlement, and the progress settlement and advanced payment.
文章引用:李贻浩, 阳龙. 国际油气管道EPC项目分包合同进度结算管理[J]. 石油天然气学报, 2019, 41(2): 71-73. https://doi.org/10.12677/JOGT.2019.412026

参考文献

[1] 王建, 张丁. 储气库项目EPC总承包的施工工序管理[J]. 科技与企业, 2015(12): 19-20.
[2] 赵修卫. 国际工程承包管理[M]. 武汉: 武汉大学出版社, 2015.
[3] 刘文明, 赵万伟. EPC总承包项目部的合同管理重点及措施[J]. 项目管理技术, 2011, 9(4): 79-82.