摘要: 采空矿区的塌陷及地表变形是石油天然气管道安全运营的潜在威胁。笔者通过分析矿区开采参数及地质条件,预测采空区地表未来沉陷区域范围及沉陷位移量,对管道进行应力应变分析校核,根据分析校核结果,采取相应的敷设措施,以确保管道建成后的安全运营。
Abstract: The collapse and surface deformation of the mining area was a potential threat to the safe operation of the oil and gas pipeline. Based on the analysis of mining parameters and geological conditions, the future subsidence area scope and subsidence displacement of subsidence area are predicted, and the stress and strain analysis and check of pipeline are carried out. According to the results of analysis and check, the corresponding laying measures are taken to ensure the safe operation of the pipeline after completion.
文章引用:郭文龙, 李丽, 李健, 李春锋. 赵楼煤矿管道敷设分析研究[J]. 石油天然气学报, 2019, 41(5): 25-29. https://doi.org/10.12677/JOGT.2019.415073

参考文献

[1] 杨晓辉, 赵梦晨, 晋新林, 等. 采空区埋地输气管道沉降机理及跨度研究[J]. 力学与工程应用, 2016, 16(7): 322-325.
[2] 蒋宏业, 王惠, 徐涛龙. 采空塌陷区埋地输气管道的变形及受力分析[J]. 中国安全生产科学技术, 2016, 12(2): 45-51.
[3] Q/SY 1487-2012, 采空区油气管道安全设计与防护技术规范[S].