水位改正方法对水道测量精度的影响分析
Impact of Water Level Correction Method on Waterway Survey Accuracy
摘要:
影响水道地形测量精度的因素包括定位精度、测深精度以及水位的获取与方式水位推算模型等。目前,水位的获取方式和推算方式也存在多样化,特别是受水库调节影响河段工程河段,水位变化频繁、且呈非线性变化。故水位获取方式以及水位改正模型是精确获得工程调节河段水道地形测量的关键因素。本文选取三峡水库影响较大的宜昌河段进行试验,综合考虑不同水库调度模式下的水道地形测量,综合采用不同软硬件、不同的水位获取方法及推算模型进行对比分析,并得出有益结论,为河段水道地形观测提供理论及实践依据,具有较强的针对性和实用性。
Abstract:
The factors affecting the accuracy of waterway topographic survey include positioning and sounding accuracies, water level acquisition and estimation methods, etc. At present, water level acquisition and estimation methods are also diversified, especially in the river reach affected by the regulation of water conservancy projects, where the water level is changed frequently and non-linearly. Therefore, how to obtain the water level and water level correction is the key to precisely obtain the topographic survey in the regulated river section. This paper chooses the Yichang river reach influenced greatly by the upper reservoir as out experiments and carries out underwater topographic survey under reservoir frequent dispatching mode. The different software, hardware and estimation methods are analyzed and compared. The useful conclusion provides a theoretical and practical basis for underwater topographic survey and has strong pertinence and practicability.
参考文献
|
[1]
|
解祥成, 等. 基于HBCORS无验潮水深测量技术在荆江河道测量工程中的应用初探[J]. 水资源与水工程学报, 2012(4): 141-144.
XIE Xiangcheng, et al. Application of HBCORS survey technique without tidal observation in Yangtze estuary channel regulation project. Journal of Water Resources and Water Engineering, 2012(4): 141-144. (in Chinese)
|
|
[2]
|
黄佑生, 顾令宇. 一种新的水面线计算方法[J]. 水利水电科技进展, 2003, 23(3): 31-33.
HUANG Yousheng, GU Lingyu. A new calculation method of water surface curves. Advances in Science and Technology of Water Resources, 2003, 23(3): 31-33. (in Chinese)
|
|
[3]
|
SL257-2017. 水道观测规范[S]. 中华人民共和国水利部, 2017.
SL257-2017. Specifications for waterway survey. Ministry of Water Resources of the People’s Republic of China, 2017. (in Chinese)
|
|
[4]
|
周儒夫, 解祥成. 水道观测水位节点布设及水位推算方法探讨[J]. 人民珠江, 2017(4): 25-28.
ZHOU Rufu,XIE Xiangcheng. Discussion on the arrangement of water level control points and the calculation method of the water level in the waterway survey. Pearl River, 2017(4): 25-28. (in Chinese)
|
|
[5]
|
成都科技大学水力学教研室. 水力学[M]. 北京: 高等教育出版社, 1982.
Department of Hydraulics, Chengdu University of Science and Technology. Hydraulics. Beijing: Higher Education Press, 1982. (in Chinese)
|
|
[6]
|
吴敬文, 周儒夫, 陈建民, 钱传俊. RTK三维水深测量的实施与精度控制[J]. 现代测绘, 2016(4): 18-20.
WU Jingwen, ZHOU Rufu, CHEN Jianmin and QIAN Chuanjun. The implementing and precision control of RTK three-dimensional bathymetric survey. Modern Surveying and Mapping, 2016(4): 18-20. (in Chinese)
|
|
[7]
|
郑伟, 李炜. GPS-RTK三维水道地形测量的应用与误差分析[J]. 中国港湾建设, 2015: 42-45.
ZHENG Wei, LI Wei. Application and error analysis of GPS-RTK three-dimensional underwater topographic survey. China Harbor Engineering, 2015: 42-45. (in Chinese)
|