基于六维平衡计分卡的省电网公司绩效评价指标确定
Determining the Performance Evaluation Indexes of the Provincial Grid Company Based on Six-Dimensional Balanced Score Card
DOI: 10.12677/MM.2019.96100, PDF,    国家自然科学基金支持
作者: 花之蕾:华北电力大学科学技术研究院,北京;骆效荣*:华北电力大学经济与管理学院,北京;樊 铮, 夏周武:国网冀北电力有限公司,北京
关键词: 六维平衡计分卡省电网公司指标体系Six-Dimensional Balanced Scorecard Provincial Grid Company Indicator System
摘要: 随着科学技术的发展,当前及今后一个时期,是我国经济转型升级的关键时期,新旧增长动能深刻转换,能源电力行业深刻变革,商业模式创新持续活跃,省电网公司的发展面临许多新的机遇和挑战,急需制定相应企业发展战略,但战略是否落实更为重要,这就需要用到平衡计分卡。本文先介绍平衡计分卡,接着在其基础上根据电网相关情况补充两个维度得到六维平衡计分卡;然后根据省电网公司的战略目标,并基于六维平衡计分卡进行战略分析;最后,在总结出省电网公司的战略目标并进行战略分析的基础上,运用六维平衡计分卡确定指标体系,为更加科学地评价省电网公司的战略实施绩效提供有效依据。
Abstract: With the development of science and technology, the current and future period is a crucial period for China’s economic transformation and upgrading. The new and old growth momentum has been profoundly transformed, the energy and power industry has undergone profound changes, business model innovation has continued to be active, and the development of provincial power grid companies faces many new opportunities. Facing challenges, it is urgent to formulate corresponding corporate development strategies, but whether the strategy is implemented is more important, which requires the use of a balance card. This paper first introduces the Balanced Scorecard, and then adds two dimensions to the six-dimensional balanced scorecard based on the grid situation; then according to the strategic goals of the provincial grid company, and based on the six-dimensional balanced scorecard, strategic analysis is made; on the basis of summarizing the strategic goals of the provincial power grid company and conducting strategic analysis, the six-dimensional balanced scorecard is used to determine the indicator system, which provides an effective basis for a more scientific evaluation of the strategic implementation performance of the provincial power grid company.
文章引用:花之蕾, 骆效荣, 樊铮, 夏周武. 基于六维平衡计分卡的省电网公司绩效评价指标确定[J]. 现代管理, 2019, 9(6): 825-832. https://doi.org/10.12677/MM.2019.96100

参考文献

[1] 刘新江. 电力企业管理的特点分析[J]. 科技创新与应用, 2012(29): 258.
[2] Scholes, K. and Johnson, G. (2001) Exploring Public Sector Strategy. Pearson Education, Harlow.
[3] 罗伯特, 卡普兰, 大卫, 等. 战略地图——化无形资产为有形成果[M]. 广州: 广东经济出版社, 2005.
[4] 卡普兰罗伯特. 自上而下打造战略地图[J]. 哈佛商业评论: 中文版, 2004(3): 114-119.
[5] Kaplan, R.S. and Norton, D.P. (2004) Strategy Maps: Converting Intangible Assets into Tangible Outcomes. Harvard Business Press, Harvard. [Google Scholar] [CrossRef
[6] 徐光华, 邵冶秋. 基于BSC的A公司战略绩效评价体系重构[J]. 会计之友, 2018(1): 108-113.
[7] Türüdüoğlu, F., Suner, N. and Yıldırım, G. (2014) Determination of Goals under Four Perspectives of Balanced Scorecards and Linkages between the Perspectives: A Survey on Luxury Summer Hotels in Turkey. Procedia-Social and Behavioral Sciences, 164, 372-377. [Google Scholar] [CrossRef
[8] 魏红梅. 平衡计分卡在国有企业绩效管理中的应用[J]. 中国建材, 2006(2): 67-69.
[9] Hoque, Z. and James, W. (2000) Linking Balanced Scorecard Measures to Size, and Market Factors: Impact on Organizational Performance. Journal of Management Accounting Research, 12, 1-17. [Google Scholar] [CrossRef
[10] 李红宇. 平衡计分卡在国有企业绩效管理中的应用[J]. 现代国企研究, 2015(14): 13-15.
[11] 戴远航, 陈磊, 闵勇, 等. 电网每日运行评价指标体系研究[J]. 电网技术, 2015, 39(6): 1611-1616.