|
[1]
|
刘鹏, 周晓晔, 衣娜. 带有减少线性恶化效应的双代理调度问题[J]. 系统工程学报, 2011, 26(3): 387-392.
|
|
[2]
|
Ng, C.T., Wang, J.-B., Cheng, T.C.E. and Lam, S.S. (2011) Flowshop Scheduling of Deteriorating Jobs on Dominating Machines. Computers & Industrial Engineering, 61, 647-654. [Google Scholar] [CrossRef]
|
|
[3]
|
Sun, L.-H., Sun, L.-Y., Wang, M.-Z. and Wang, J.-B. (2012) Flow Shop Makespan Minimization Scheduling with Deteriorating Jobs under Dominating Machines. International Journal of Production Economics, 138, 195-200. [Google Scholar] [CrossRef]
|
|
[4]
|
Pei, J., Pardalos, P.M., Liu, X., Fan, W. and Yang, S. (2015) Serial Batching Scheduling of Deteriorating Jobs in a Two-Stage Supply Chain to Minimize the Makespan. European Journal of Operational Research, 244, 13-25. [Google Scholar] [CrossRef]
|
|
[5]
|
Gawiejnowicz, S. (2008) Time-Dependent Scheduling. Springer, Berlin.
|
|
[6]
|
王吉波, 郭苗苗, 刘桓, 李琳, 王丹. 具有依赖开工时间恶化工件的流水作业排序问题研究综述[J]. 沈阳航空航天大学学报, 2016, 33(3): 1-10.
|
|
[7]
|
Potts, C.N. and Van Wassenhove, L.N. (1992) Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity. Journal of Operational Research Society, 43, 395-406. [Google Scholar] [CrossRef]
|
|
[8]
|
Webster, S. and Baker, K.R. (1995) Scheduling Groups of Jobs on a Single Machine. Operations Research, 43, 692-703. [Google Scholar] [CrossRef]
|
|
[9]
|
Neufeld, J.S., Gupta, J.N.D. and Buscher, U. (2016) A Comprehensive Review of Flowshop Group Scheduling Literature. Computers and Operations Research, 70, 56-74. [Google Scholar] [CrossRef]
|
|
[10]
|
Wu, C.C., Shiau, Y.R. and Lee, W.C. (2008) Single-Machine Group Scheduling Problems with Deterioration Consideration. Computers and Operations Research, 35, 1652-1659. [Google Scholar] [CrossRef]
|
|
[11]
|
Wu, C.C. and Lee, W.C. (2008) Single-Machine Group-Scheduling Problems with Deteriorating Setup Times and Job-Processing Times. International Journal of Production Economics, 115, 128-133. [Google Scholar] [CrossRef]
|
|
[12]
|
Lee, W.-C. and Lu, Z.-S. (2012) Group Scheduling with Deteriorating Jobs to Minimize the Total Weighted Number of Late Jobs. Applied Mathematics and Computation, 218, 8750-8757. [Google Scholar] [CrossRef]
|
|
[13]
|
Wang, J.-B., Huang, X., Wu, Y.-B. and Ji, P. (2012) Group Scheduling with Independent Setup Times, Ready Times, and Deteriorating Job Processing Times. International Journal of Advanced Manufacturing Technology, 60, 643-649. [Google Scholar] [CrossRef]
|
|
[14]
|
Xu, Y.-T., Zhang, Y. and Huang, X. (2014) Single-Machine Ready Times Scheduling with Group Technology and Proportional Linear Deterioration. Applied Mathematical Modelling, 38, 384-391. [Google Scholar] [CrossRef]
|
|
[15]
|
王吉波, 赵伯来. 具有独立调整时间和恶化效应的单机成组排序问题研究[J]. 沈阳航空航天大学学报, 2017, 34(4): 82-87.
|
|
[16]
|
Wei, C.-M. and Wang, J.-B. (2010) Single Machine Quadratic Penalty Function Scheduling with Deteriorating Jobs and Group Technology. Applied Mathematical Modelling, 34, 3642-3647. [Google Scholar] [CrossRef]
|