长江上游梯级水电站群的水能宏观关系研究
Relationship between Water and Energy for Cascade Hydropower Stations in Upper Reaches of the Yangtze River
DOI: 10.12677/JWRR.2020.91011, PDF,   
作者: 龚文婷, 刘 攀:武汉大学水资源与水电工程科学国家重点实验室,湖北 武汉
关键词: 水–能转化关系水库调度梯级水电站群Water-Energy Conversion Relationship Reservoir Operation Cascade Reservoir Group
摘要: 水电站可将水能资源转化为电能。揭示宏观的水能关系,可直接实现流域内电站的发电量与水资源量的相互估算,为简单、快捷实现水–能相互转化提供依据。选取长江上游21座大型梯级水电站群为研究对象,分别采用常规调度和确定性优化调度方式,得到模拟调度结果,由此建立了年尺度的水–能转化关系。研究发现:1) 各水电站的出库流量与其发电量线性关系显著;2) 流域总水资源量与梯级水电站群总发电量也存在线性关系;3) 以各水电站总装机容量作为权重,水能关系拟合效果更佳。提出的方法为依据发电量估计水资源量或依据水资源量估算发电量提供了新途径。
Abstract: Hydropower stations convert water energy into electricity. The estimation of hydropower generation of power stations and water resources of basins from each other can be directly implemented in a simple way, which provides a basis for water-energy conversion. The 21 large-scale cascade hydropower stations in upper reaches of the Yangtze River were selected as the case study, and the conventional and deterministic optimization operations were used to simulate reservoir operation, and then the water-energy conversion relationship was established. The results show that: 1) the linear relationship between the outflow and power generation is significant for a single hydropower station; 2) there is a linear relationship between the total water resources of the basin and the total power generation of the cascade hydropower stations and 3) the water energy relationship has a better goodness of fitting when the installed capacity is used as the weight. The proposed method provides a new way to estimate the amount of water resources based on power generation, and to estimate the power generation from water resources.
文章引用:龚文婷, 刘攀. 长江上游梯级水电站群的水能宏观关系研究[J]. 水资源研究, 2020, 9(1): 106-114. https://doi.org/10.12677/JWRR.2020.91011

参考文献

[1] MING, B., LIU, P., GUO, S., et al. Optimizing utility-scale photovoltaic power generation for integration into a hydropower reservoir by incorporating long- and short-term operational decisions. Applied Energy, 2017, 204: 432-445.[CrossRef
[2] 陈进. 长江流域水资源调控与水库群调度[J]. 水利学报, 2018, 49(1): 2-8. CHEN Jin. Regulation of water resources and operation of reservoir group in the Yangtze River basin. Journal of Hydraulic Engineering, 2018, 49(1): 2-8. (in Chinese)
[3] FAN, J.-L., et al. Relationship between energy production and water resource utilization: A panel data analysis of 31 provinces in China. Journal of Cleaner Production, 2017, 167: 88-96.[CrossRef
[4] 贾东旭. 提高水电站水库水能利用率的方法[J]. 水电自动化与大坝监测, 2002, 26(2): 54-58, 64. JIA Dongxu. Method of improving water power utilization rate and hydropower stations. Hydropower Automation and Dam Monitoring, 2002, 26(2): 54-58, 64. (in Chinese)
[5] 刘心愿, 郭生练, 刘攀, 李响. 考虑综合利用要求的三峡水库提前蓄水方案[J]. 水科学进展, 2009, 20(6): 851-856. LIU Xinyuan, GUO Shenglian, LIU Pan and LI Xiang. Scheme of impounding in advance for the Three Gorges Reservoir by considering the comprehensive utilization benefits. Advances in Water Science, 2009, 20(6): 851-856. (in Chinese)
[6] 姚磊. 水轮发电机增容改造技术对水轮机提高水能利用率的影响[J]. 电力系统装备, 2017(11): 77, 135. YAO Lei. Influence of hydraulic turbine generator capacity increasing technology on hydraulic energy utilization rate of hydraulic turbine. Electric System, 2017(11): 77, 135. (in Chinese)
[7] TSOLAS, S. D., KARIM, M. N. and HASAN, M. M. F. Optimization of water-energy nexus: A network representation-based graphical approach. Applied Energy, 2018, 224: 230-250.[CrossRef
[8] JU-HWAN, Y. Maximization of hydropower generation through the application of a linear programming model. Journal of Hydrology, 2009, 376(1-2): 182-187. [Google Scholar] [CrossRef
[9] 陈西臻, 刘攀, 何素明, 张旺, 李泽君, 张靖文. 基于聚合-分解的并联水库群防洪优化调度研究[J]. 水资源研究, 2015(4): 23-31. CHEN Xizhen, LIU Pan, HE Suming, ZHANG Wang, LI Zejun and ZHANG Jinwen. Optimization of parallel reservoirs for flood control based on the aggregation-decomposition method. Journal of Water Resources Research, 2015(4): 23-31. (in Chinese) [Google Scholar] [CrossRef
[10] 马立亚, 雷晓辉, 蒋云钟, 王浩. 基于DPSA的梯级水库群优化调度[J]. 中国水利水电科学研究院学报, 2012, 10(2): 140-145. MA Liya, LEI Xiaohui, JIANG Yunzhong and WANG Hao. Optimal operation of cascade reservoirs based on DPSA. Journal of China Institute of Water Resources and Hydropower Research, 2012, 10(2): 140-145. (in Chinese)
[11] 李克飞, 武见, 董滇红, 王林威. 基于DPSA的水库优化调度方案研究[J]. 人民黄河, 2015, 37(10): 128-130. LI Kefei, WU Jian, DONG Dianhong and WANG Linwei. Research on reservoir optimization scheduling scheme based on DPSA. Yellow River, 2015, 37(10): 128-130. (in Chinese)
[12] 郭生练, 陈炯宏, 刘攀. 水库群联合优化调度研究进展与展望[J]. 水科学进展, 2010, 21(4): 496-503. GUO Shenglian, CHEN Jionghong, LIU Pan. State-of-the-art review of joint operation for multi-reservoir systems. Advances in Water Science, 2010, 21(4): 496-503. (in Chinese)
[13] 刘丹雅. 三峡及长江上游水库群水资源综合利用调度研究[J]. 人民长江, 2010, 41(15): 5-9. LIU Danya. Study on water resources comprehensive utilization scheduling of the Three Gorges and the upper reaches of the Yangtze River. Yangtze River, 2010, 41(15): 5-9. (in Chinese)
[14] 丁毅, 傅巧萍. 长江上游梯级水库群蓄水方式初步研究[J]. 人民长江, 2013, 44(10): 72-75. DING Yi, FU Qiaoping. Preliminary study on water storage method of cascade reservoirs in the upper reaches of the Yangtze River. Yangtze River, 2013, 44(10): 72-75. (in Chinese).