选矿浮选流程的现代化升级改造研究
Research on Modernization and Transformation of Mineral Processing Flotation Process
DOI: 10.12677/ME.2020.81004, PDF,  被引量   
作者: 王明嘉:北方重工集团有限公司,辽宁 沈阳
关键词: 选矿实践升级改造浮选机3D设计布置Beneficiation Practice Upgrading Flotation Machine 3D Design and Layout
摘要: Gibraltar矿山粗选机浮选回路的现代化是一个很好的例证。该改造项目包括用新的浮选槽取代原有的3排16个浮选槽,这些浮选槽已达到使用寿命的终点。该项目的设计目标是将浮选停留时间增加一倍,以支持更高的磨机吨位,提高金属回收率,并安装现代设备,来保证25年矿山寿命的运营。
Abstract: The modernization of the flotation circuit of the Gibraltar mine roughing machine is a good example. The transformation project includes replacing three rows of 16 flotation cells with new ones, which have reached the end of their useful life. The design goal of the project is to double the flotation residence time to support higher mill tonnages, improve metal recovery rates, and install modern equipment to ensure 25-year mine life operations.
文章引用:王明嘉. 选矿浮选流程的现代化升级改造研究[J]. 矿山工程, 2020, 8(1): 24-29. https://doi.org/10.12677/ME.2020.81004

参考文献

[1] 李振, 刘炯天, 王永田, 曹亦俊. 浮选技术的发展现状及展望[J]. 选矿技术资讯, 2014(4): 12-13.
[2] 徐超, 张文平, 高腾跃, 蔡明明, 秦广林, 陈艳波. 新疆某铜锌多金属矿石优先浮铜可行性研究[J]. 现代矿业, 2019(4): 22-23.
[3] 邓中. 矿业建设工程的环境影响分析[D]: [硕士学位论文]. 陕西: 西北农林科技大学, 2011.
[4] 钟清, 韦建军, 兰小光, 付济林. 多槽浮选机集中拖动方式的能耗分析与可行性研究[J]. 矿山机械, 2016(6): 55-57.
[5] 胡强, 彭仕冕. 梭罗沟金矿选矿厂2000 t/d改扩建及生产管理实践[J]. 现代矿业, 2019(3): 9-11.