|
[1]
|
Huang, H., Wang, T., Ben, K., et al. (2019) Life-Cycle Assessment of Emerging CO2 Mineral Carbona-tion-Curedconcrete Blocks: Comparative Analysis of CO2 reduction Potential Andoptimization of Environmental Impacts. Journal of Cleaner Production, 241, Article ID: 118359. [Google Scholar] [CrossRef]
|
|
[2]
|
Vyas, G.S., Jha, K.N. and Patel, D.A. (2019) Development of Green Building Rating System Using AHP and Fuzzy Integrals: A Case of India. Journal of Architectural Engineering, 25, Article ID: 04019004. [Google Scholar] [CrossRef]
|
|
[3]
|
Ali, H.H. and Al Nsairat, S.F. (2008) Developing a Green Building Assessment Tool for Developing Countries—Case of Jordan. Building and Environment, 44, 1053-1064. [Google Scholar] [CrossRef]
|
|
[4]
|
Azizian, M.F. and Nelson, P.O. (2003) Environmental Impact of Highway Construction and Repair Materials on Surface and Ground Waters: Case study. Crumb Rubber Asphalt Concrete. Waste Management, 23, 719-728. [Google Scholar] [CrossRef] [PubMed]
|
|
[5]
|
张健. 高速铁路绿色施工节材与材料资源利用[D]: [硕士学位论文]. 兰州: 兰州交通大学, 2018.
|
|
[6]
|
辛军. 铁路隧道施工环境保护、水土保持的重要性分析[J]. 住宅与房地产, 2019(24): 197.
|
|
[7]
|
刘伟, 付海陆, 耿伟, 等. 天目山隧道施工废水特征分析及处理[J]. 隧道建设, 2017, 37(7): 845-850.
|
|
[8]
|
纪真. 节能环保水压爆破技术在铁路隧道施工中的应用[J]. 施工技术, 2015, 44(S1): 203-205.
|
|
[9]
|
高昕. 隧道施工噪声产生的原因分析及解决措施[J]. 电声技术, 2019, 43(7): 14-16+25.
|
|
[10]
|
吕向红. 隧道施工中粉尘控制方法研究[J]. 环境科学与管理, 2018, 43(12): 79-82.
|
|
[11]
|
罗鉴银, 傅瓦利. 岩溶地区开挖隧道对水资源的影响——以渝合高速公路隧道为例[J]. 西南农业大学学报(自然科学版), 2006, 28(1): 154-156+160.
|
|
[12]
|
邓朗妮, 黄如寤. 基于价值工程的绿色施工方案评价[J]. 施工技术, 2007, 36(S1): 449-451.
|
|
[13]
|
卢国春, 卢克强, 汪仲琦. 绿色施工在北京国美商都A区工程的实施[J]. 施工技术, 2009, 38(11): 42-45.
|
|
[14]
|
段春伟. 绿色施工在某公共建筑中的实施[J]. 施工技术, 2009, 38(11): 49-51.
|