利用静力水准测量运营地铁竖向变形误差分析
Error Analysis for Measurement on Vertical Deformation of Existing Subway by Hydrostatic Leveling Sensor
DOI: 10.12677/HJCE.2020.93021, PDF,    科研立项经费支持
作者: 柳 飞, 贺美德:北京市市政工程研究院,北京;北京市建设工程质量第三检测所有限责任公司,北京;吴炼石:北京市水利规划设计研究院,北京
关键词: 静力水准既有地铁竖向变形误差分析Hydrostatic Leveling Sensor Existing Subway Vertical Deformation Error Analysis
摘要: 静力水准作为一种高精度的高程测量仪器在既有地铁的变形监测中应用广泛。但是列车运行会对静力水准的监测结果产生影响。为了更好的利用静力水准这一监测手段,本文结合工程实际,利用高精度静力水准仪对地铁隧道状况进行24小时实时监测,通过分析数据,探讨静力水准测量运营地铁竖向变形的误差,提出静力水准监测数据的选取方法,以确保既有地铁变形监测数据的准确性。
Abstract: As a kind of high-precision measurement instrument, the hydrostatic leveling sensor system is widely used in measurement on the displacement of existing subway. However, the train opera-tion has an impact on the monitoring results. In order to make better use of hydrostatic leveling sensor system, combined with the engineering practice, the hydrostatic leveling sensor system is employed for 24 hours monitoring of existing subway. Based on the analysis of data, the error of measurement on vertical deformation of existing subway by hydrostatic leveling sensor is dis-cussed and the selection method of data is introduced.
文章引用:柳飞, 贺美德, 吴炼石. 利用静力水准测量运营地铁竖向变形误差分析[J]. 土木工程, 2020, 9(3): 185-192. https://doi.org/10.12677/HJCE.2020.93021

参考文献

[1] 何晓业. 静力水准系统的最新发展及应用[M]. 合肥: 中国科学技术大学出版社, 2010.
[2] Parker, D.H., Rad-cliff, B. and Shelton, J.W. (2005) Advances in Hydrostatic Leveling with the NPH6, and Suggestions for Further Enhancements. Precision Engineering, 29, 367-374.
[Google Scholar] [CrossRef
[3] Rice, W.P., Fenandez, E.G., Jarog, D. and Jensen, A. (2000) A Comparison of Hydrostatic Leveling Methods in Invasive Pressure Monitoring. Critical Care Nurse, 20, 20-30.
[Google Scholar] [CrossRef
[4] Pellissier, P. (1994) Pellissier Model H5-Portable Hy-drostatic Level/Tiltmeter. Technical Report 116, GBT Memo Series.
[5] 张建坤, 陈昌彦, 白朝旭, 徐国双, 郑瑶. 影响静力水准监测质量的关键技术问题探讨[J]. 工程勘察, 2012, 40(9): 73-82.
[6] 孙泽信, 张书丰, 刘宁. 静力水准仪在运营期地铁隧道变形监测中的应用及分析[J]. 现代隧道技术, 2015, 52(1): 203-208.
[7] 魏纲, 李钢, 苏勤卫. 基坑工程对运营地铁隧道影响的实测分析[J]. 现代隧道技术, 2014, 51(1): 179-185.