水电为主电网日前发电调度方法研究
A Day-Ahead Generation Dispatching Method for a Hydro-Dominated Power Grid
DOI: 10.12677/JWRR.2020.94042, PDF,    国家科技经费支持
作者: 李秀峰, 蒋 燕, 张聪通, 周彬彬:云南电力调度控制中心发电管理科,云南 昆明;申建建*:大连理工大学水利工程学院,辽宁 大连
关键词: 以水电为主电网电站群短期调度水力发电Hydro-Dominated Power Grid Power Plants Short-Term Dispatching Hydropower Generation
摘要: 针对水电为主电网短期调度问题,提出一种大规模电站群日前发电调度方法。基于电网预测负荷与实际负荷过程,采用相关分析法优选计划参考日,确定电站初始计划;考虑面临水位和来水等约束条件,进行水力校核以确定水库弃水或放空情况,并启发式调整发电量保证计划可行性;选择少量调节性能较好电站参与平衡计算,采用等负荷率方法优化水电站出力,实现系统电力平衡。通过实际仿真分析,本文方法能快速得到日前96点发电计划,满足以水电为主电网大规模电站群短期计划编制时效性和实用性要求。
Abstract: A day-ahead generation dispatching method for large-scale power plant group is proposed to solve short-term operation problems of a hydro-dominated power grid. Based on the forecasting load and the actual load profiles of the power grid, the correlation analysis method is used to select a reference date to determine initial generation schedules of each power plant. The current reservoir levels, inflow, and other constraints and conditions are considered to check the hydraulic connection and recognize reservoir spillage or empty states. A heuristic method is developed to adjust generation energy to assure the feasi-bility of day-ahead schedules. Some dispatchable hydropower plants are finally selected to meet load balance using an equally load-rate method. Finally, the application example shows that the proposed method can quickly obtain 96-point day-ahead power generation schedules, which can meet the timeliness and practicality requirements of short-term generation scheduling for large-scale power plants in a hydro-dominated power grid.
文章引用:李秀峰, 蒋燕, 张聪通, 周彬彬, 申建建. 水电为主电网日前发电调度方法研究[J]. 水资源研究, 2020, 9(4): 403-410. https://doi.org/10.12677/JWRR.2020.94042

参考文献

[1] HUANG H., YAN Z. Present situation and future prospect of hydropower in China. Renewable and Sustainable Energy Reviews, 2009, 13(6-7): 1652-1656. [Google Scholar] [CrossRef
[2] CHENG C. T., SHEN J. J., WU X. Y., et al. Operation challenges for fast-growing China’s hydropower systems and respondence to energy saving and emission reduction. Renewable and Sustainable Energy Reviews, 2012, 16(5): 2386-2393. [Google Scholar] [CrossRef
[3] 程春田, 申建建, 武新宇, 等. 大规模复杂水电优化调度系统的实用化求解策略及方法[J]. 水利学报, 2012, 43(7): 785-795. CHENG Chuntian, SHEN Jianjian, WU Xinyu, et al. Practicalsolution strategies and methods of large-scale complex hydropower system operations. Journal of Hydraulic Engineering, 2012, 43(7): 785-795. (in Chinese)
[4] BARROS M. T. L., TSAI F. T. C., YANG S., et al. Optimization of large-scale hydropower system operations. Journal of Water Resources Planning and Man-agement, 2003, 129(3): 178-188. [Google Scholar] [CrossRef
[5] FINARDI E. C., SCUZZIATO M. R. Hydro unit com-mitment and loading problem for day-ahead operation planning problem. Electrical Power and Energy Systems, 2013, 44(1): 7-16. [Google Scholar] [CrossRef
[6] CHENG C.-T., SHEN J.-J. and WU X.-Y. Short-term hydro scheduling with discrepant objectives using multi-steps of progressive optimality algorithm. Journal of the American Water Resources Asso-ciation, 2012, 48(3): 464-479. [Google Scholar] [CrossRef
[7] SHAWWASH Z. K., SIU T. K. and RUSSELL D. The B.C. hydro short term hydro scheduling optimization model. IEEE Transactions on Power Systems, 2000, 15(3): 1125-1131. [Google Scholar] [CrossRef
[8] 唐俊杰, 牛焕娜, 杨明皓. 基于线性相关分析的周期自回归短期负荷预测[J]. 电力系统保护与控制, 2010(14): 128-133. TANG Junjie, NIU Huanna and YANG Minghao. Periodic autoregressive short-term forecasting method based on the linear cor-relation analysis. Power System Protection and Control, 2010(14): 128-133. (in Chinese)
[9] 余平, 唐杰阳, 蒲瑜, 等. 流域梯级电站群短期负荷计划分配方法研究[J]. 中国农村水利水电, 2015(6): 166-169. YU Ping, TANG Jieyang, PU Yu, et al. Research on the method of short-term load plan distribution in cascade hydropower sta-tions. China Rural Water and Hydropower, 2015(6): 166-169. (in Chinese)
[10] 涂启玉, 蔡华祥. 云南电力电量平衡分析[J]. 云南电力技术, 2013, 41(3): 50-53. TU Qiyu, CAI Huaxiang. Analysis on power and energy balance in Yunnan. Yunnan Power Technology, 2013, 41(3): 50-53. (in Chinese)
[11] 施建华, 谭素梅. 节能发电调度发电计划编制算法[J]. 电力系统自动化, 2008, 32(24): 48-51. SHI Jianhua, TAN Sumei. Algorithm of energy saving generation dispatch scheduling. Automation of Electric Power Systems, 2008, 32(24): 48-51. (in Chinese)