梯级水电站期末蓄能最大模型简化求解方法
A Simplified Solution Method for End-of-Term Storage Energy Maximization Model of Cascaded Hydropower Station
DOI: 10.12677/JWRR.2020.94037, PDF,  被引量    国家自然科学基金支持
作者: 武新宇, 邵金鑫, 廖胜利, 郭 锐, 程玺龙:大连理工大学建设工程学部,辽宁 大连
关键词: 期末蓄能最大短期调度凝聚函数Storage Energy Maximization Model Short-Term Optimal Operation Aggregate Function
摘要: 梯级水电站期末蓄能最大模型求解复杂,采用拉格朗日松弛算法求解时需要对多个时段对应的乘子更新迭代,求解效率较低。本文为降低乘子规模大对模型求解造成的影响,提出了一种简化的求解方法。该方法首先将多个时段梯级总出力约束转换一个约束,利用凝聚函数法将该约束进行近似的转化,并建立只有一个乘子的对偶优化问题。而后采用次梯度法和逐次逼近法对简化后的新问题进行求解。以乌江梯级电站为背景的实例应用表明,提出的方法能有效降低问题复杂度,提高求解效率和求解质量,满足短期优化调度的时效性和实用性要求。
Abstract: The end-of-term storage energy maximization model of cascaded hydropower station is complicated to solve. Using Lagrange relaxation method directly, the solution efficiency is low for it involves the update iteration of large scale multiplier vector. In this paper, a simplified solution method is proposed in order to reduce the impact of the multiplier scale on the solution. The period cascade power constraints are replaced by one constraint. Then the new constraint is further approximated using the aggregate function and a dual optimization problem with only one multiplier is established. The sub-gradient method and successive approximation method are used to solve the new problem. Case study for Wu River cascaded hydropower system shows that the method can effectively reduce problem complexity, improve solution efficiency and solution quality, and satisfy the timeliness and practicality requirements of short-term optimal scheduling.
文章引用:武新宇, 邵金鑫, 廖胜利, 郭锐, 程玺龙. 梯级水电站期末蓄能最大模型简化求解方法[J]. 水资源研究, 2020, 9(4): 353-362. https://doi.org/10.12677/JWRR.2020.94037

参考文献

[1] 程春田, 申建建, 武新宇, 廖胜利. 大规模复杂水电优化调度系统的实用化求解策略及方法[J]. 水利学报, 2012, 43(7): 785-795+802. CHENG Chun-Tian, SHEN Jian-Jian, WU Xin-Yu and LIAO Sheng-Li. Practical solution strategies and methods of large-scale complex hydropower system operations. Journal of Hydraulic Engineering, 2012, 43(7): 785-795+802. (in Chinese)
[2] 程春田, 武新宇, 申建建, 廖胜利. 大规模水电站群短期优化调度方法I: 总体概述[J]. 水利学报, 2011, 42(9): 1017-1024. CHENG Chun-Tian, SHEN Jian-Jian, WU Xin-Yu and LIAO Sheng-Li. Short-term optimal operation methods of large-scale hydropower plants I. General overview. Journal of Hydraulic Engineering, 2011, 42(9): 1017-1024. (in Chi-nese)
[3] SHAWWASH Z. K., SIU T. K., RUSSEL S. O. The BC hydro short term hydro scheduling optimization model. Power Industry Computer Applications, IEEE Pica 99 IEEE International Conference, 1999.
[4] PIEKUTOWSKI M., LITWINOWICZ T., FROWD R. J. Optimal short-term scheduling for a large-scale cascaded hydro system. IEEE Transactions on Power Systems, 1994, 9(2): 805-811. [Google Scholar] [CrossRef
[5] 程春田, 武新宇, 申建建, 李刚, 廖胜利, 刘本希. 亿千瓦级时代中国水电调度问题及其进展[J]. 水利学报, 2019, 50(1): 112-123. CHENG Chun-Tian, WU Xin-Yu, SHEN Jian-Jian, LI Gang, LIAO Sheng-Li and LIU Ben-Xi. A state-of-the-art review of China’s hydropower operations and the recent advances in the era of gigawatts. Journal of Hydraulic Engineering, 2019, 50(1): 112-123. (in Chinese)
[6] 陈森林, 万俊, 刘子龙, 乐玉华. 水电系统短期优化调度的一般性准则(1)——基本概念与数学模型[J]. 武汉水利电力大学学报, 1999(3): 35-38. CHEN Sen-Lin, WAN Jun, LIU Zi-Long and LE Yu-Hua. The general principle of short-term optimization dispatching in hydro-electric system (1)—Basic conception and mathematical model. Journal of Wuhan University of Hydraulic and Electric Engineer-ing, 1999(3): 35-38. (in Chinese)
[7] GUAN X. H., NI E. N., LI R. H. and LUH P. B. An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints. IEEE Transactions on Power Systems, 1997, 12(4): 1775-1780. [Google Scholar] [CrossRef
[8] 李兴斯. 解非线性极大极小问题的凝聚函数法[J]. 计算结构力学及其应用, 1991(1): 85-92. LI Si-Xing. Aggregate function method for solving minimax problems. Computational Structural Mechanics and Its Application, 1991(1): 85-92. (in Chinese).