中小河流推移质测验装置的设计与应用
Design and Application of the Bed Load Measuring Device for Medium and Small Rivers
DOI: 10.12677/JWRR.2020.94044, PDF,    科研立项经费支持
作者: 周 苗, 王 琴, 周儒夫, 唐 剑:长江水利委员会水文局荆江水文水资源勘测局,湖北 荆州
关键词: 中小河流推移质采集器校准器联控支架Medium and Small Rivers Bed Load Collector Calibrator Joint Control Support
摘要: 推移质运动极其复杂,且推移质泥沙又主要集中在洪水期间,因而推移质泥沙测验及其装置研制仍是一个世界难题和热点问题。本文讲述了一种适用中小河流推移质精准测验装置的设计,主要由推移质采集器、推移质校准器和船载联控支架等三部分组成,同时论述了推移质测验装置的具体操作和测验方法,可有效解决中小河流推移质“无法测、测不到、测不准”的难题,为新的水沙条件下河流推移质测验提供一定借鉴和参考。
Abstract: The bed load movement is very complex, and the bed load sediment is mainly concentrated in the flood period, so the bed load sediment measurement and device development are still a world problem and hot issue. This paper describes the design of an accurate bed load testing device for small and medium-sized rivers, the bed load testing device includes three parts: bed load collector, bed load calibrator and ship-borne joint control support. Meanwhile, it discusses the specific operation and testing methods of bed load testing device, which can effectively solve the problem of “no way to measure, no substance available for test and inaccurate test” in the bed load of small and medium-sized rivers and provide a certain reference for river bed load testing under new water and sediment conditions.
文章引用:周苗, 王琴, 周儒夫, 唐剑. 中小河流推移质测验装置的设计与应用[J]. 水资源研究, 2020, 9(4): 421-427. https://doi.org/10.12677/JWRR.2020.94044

参考文献

[1] 张根广, 周双, 王愉乐, 刘余. 泥沙输移问题研究进展与展望[J]. 水利与建筑工程学报, 2019, 17(4): 8-15 ZHANG Genguang, ZHOU Shuang, WANG Yule and LIU Yu. Research progress and prospect of sediment transport. Journal of Water Conservancy and Construction Engineering, 2019, 17(4): 8-15. (in Chinese)
[2] 刘德春, 周建红. 川江推移质泥沙观测技术研究[M]. 武汉: 长江出版社, 2012. LIU Dechun, ZHOU Jianhong. Study on observation technology of bed load and sediment in Chuanjiang River. Wuhan: Changjiang Press, 2012. (in Chinese)
[3] 王洪杨, 姚仕明, 周儒夫. 三峡水库下游荆江河段推移质输沙率计算方法分析[J]. 泥沙研究, 2017(1): 6-11. WANG Hongyang, YAO Shiming, ZHOU Rufu. Analysis on calculation method of bed load sediment transport rate in Jingjiang River reach downstream of Three Gorges Reservoir. Sediment Research, 2017(1): 6-11. (in Chinese)
[4] 田永生, 范中海. 典型推移质输沙率计算方法概述[J]. 东北水利水电, 2007(11): 40-42. TIAN Yongsheng, FAN Zhonghai. Summary of calculation method of typical bed load sediment transport rate. Northeast Water Conservancy and Hydropower, 2007(11): 40-42. (in Chinese)
[5] 韩其为. 推移质中的几个理论问题研究[J]. 中国水利, 2004(18): 48-52. HAN Qiwei. Study on several theoretical problems of bed load. China Water Conservancy, 2004(18): 48-52. (in Chinese)
[6] 刘德春, 高焕锦, 朱君国. AYT型砾卵石推移质采样器试验研究[J]. 人民长江, 2003(7): 26-27+37. LIU Dechun, GAO Huanjin, ZHU Junguo. Experimental study on AYT gravel bed load sampler. People’s Yangtze River, 2003(7): 26-27+37. (in Chinese)
[7] 易定嵘, 程代忠. 三峡库区卵石推移质观测方法[J]. 中国水运, 2007(3): 48-49. YI Dingrong, CHENG Daizhong. Observation method of pebble bed load in Three Gorges Reservoir area. China Water Transport, 2007(3): 48-49. (in Chinese)
[8] 唐剑. 广东东江沥口枢纽坝下河段底沙推移质现场观测报告[C]. 长江委水文局荆江水文水资源勘测局, 2020. TANG Jian. Field observation report on bed load of bottom sediment at the lower reach of Lijiou Junction of Dongjiang River in Guangdong Province. Jingjiang Bureau of Hydrological and Water Resources Survey, Bureau of Hydrology, Changjiang Water Resources Commission, 2020. (in Chinese)