缺资料流域的水文断面设计流量分析计算
Analysis and Calculation of Design Discharge of Hydrological Section in the Scarce Data Basin
DOI: 10.12677/JWRR.2020.94047, PDF,   
作者: 王 平, 田 晓:中交路桥建设有限公司海外分公司,北京;蒙江鹏:中交第一公路勘察设计研究院有限公司,陕西 西安
关键词: 缺资料设计流量暴雨洪水推理公式印度河流域Scarce Data Design Discharge Rainstorm and Flood Reasoning Formula Indus River Basin
摘要: 缺资料流域的水文计算是目前工程项目应用中的难点。本文在对Siran沿线水文资料的收集与分析基础上,并在实地调查测量获取河道特征水位的情况下,计算桥梁设计洪峰流量。小流域洪水暴涨暴落,历时短,很少能留下明显的痕迹,往往不会引起人们的注意,故难以调查到较为可靠的历史洪水资料,且没有水文站的观测资料。采用非连续水文观测资料推算法和暴雨推理公式计算法进行流量计算,结果表明暴雨推理公式计算法较合理,研究结果可用于指导本项目的桥梁设计,为巴基斯坦印度河流域水文计算提供了参考依据。
Abstract: The hydrological calculation in the scarce data basin is very difficult at present. Based on the collection and analysis of hydrological data along Siran, and on the condition that the characteristic water level of river channel is obtained through field survey, the design peak flow of local bridge of small watershed is calculated. The flood in small watersheds has a short period of time, leaving few obvious traces, which often does not attract people’s attention. Therefore, it is difficult to investigate more reliable historical flood data, and there is no observation data from hydrological stations. The calculation method of discontinuous hydrological observation data and the rainstorm rational formula are used to design peak discharge. The results show that the rainstorm rational formula is more reasonable and suitable for the bridge design of the project. The research results can provide a reference for the hydrological calculation of Indus River Basin in Pakistan.
文章引用:王平, 蒙江鹏, 田晓. 缺资料流域的水文断面设计流量分析计算[J]. 水资源研究, 2020, 9(4): 444-452. https://doi.org/10.12677/JWRR.2020.94047

参考文献

[1] 刘苏峡, 夏军, 莫兴国. 无资料流域水文预报(PUB计划)研究进展[J]. 水利水电技术, 2005, 36(2): 9-12. LIU Suxia, XIA Jun, MO Xingguo. Research progress of hydrological forecast (pub plan) for non data basins. Water Conserv-ancy and Hydropower Technology, 2005, 36(2): 9-12. (in Chinese)
[2] 程卫帅. 山洪灾害临界雨量研究综述[J]. 水科学进展, 2013, 24(6): 901-908. CHENG Weishuai. A review of the study on critical rainfall of mountain torrents. Advance in Water Science, 2013, 24(6): 901-908. (in Chinese)
[3] 刘志雨, 杨大文, 胡健伟. 基于动态临界雨量的中小河流山洪预警方法及其应用[J]. 北京师范大学学报(自然科学版), 2010, 46(3): 317-321. LIU Zhiyu, YANG Dawen, HU Jianwei. Early warning method and application of flash floods in small and medium rivers based on dynamic critical rainfall. Journal of Beijing Normal University (Natural Science Edition), 2010, 46(3): 317-321. (in Chi-nese)
[4] 叶金印, 李致家, 常露. 基于动态临界雨量的山洪预警方法研究与应用[J]. 气象, 2014, 40(1): 101-107. YE Jinyin, LI Zhijia, CHANG Lu. Study and application of flash flood warning method based on dynamic critical rainfall. Mete-orology, 2014, 40(1): 101-107. (in Chinese)
[5] 江锦红, 邵利萍. 基于降雨观测资料的山洪预警标准[J]. 水利学报, 2010, 41(4): 458-163. JIANG Jinhong, SHAO Liping. Early warning standard of mountain flood based on rainfall observation data. Journal of Hyduaulic Engineering, 2010, 41(4): 458-163. (in Chinese)
[6] GUPTA, V. K., SOROOSHIAN, S. The relationship between data and the precision of estimate parameters. Journal of Hydrology, 1985, 81: 55-77.[CrossRef
[7] WANG, Q. J. The genetic algorithm and its application to calibrating conceptual rainfall runoff models. Water Resource Research, 1991, 27: 2467-2471.[CrossRef
[8] DUAN, Q. J., SOROOSHIAN, S., GUPTA, V. K. Optimal use of SCE-UA global optimization methods for calibrating watershed models. Journal of Hydrology, 1994, 158: 265-284.[CrossRef
[9] HAPUARACHCHI, H. A. P., LI, Z. J., WANG, S. H. Application of SCE-UA method for calibrating the Xinanjiang watershed model. Journal of Lake Sciences, 2001, 12: 333-341.
[10] LI, H. X., ZHANG, Y. Q., CHIEW, F. H. S., et al. Predicting runoff in ungauged catchments by using Xinanjiang model with MODIS leaf area index. Journal of Hydrology, 2009, 370: 155-162.[CrossRef