综采面过断层的布设方式探讨
Discussion on the Layout of the Fault in Fully Mechanized Mining Face
摘要: 随着综合机械化采煤工作面过断层现场技术及经验的积累与完善,经过不断探索和发展,针对不同类型的断层构造,对应的过断层的方式也趋于多样化,常见的方式有调整割煤高度法、破顶起底法、强割硬过法、跳采法和综合方法。综采工作面过断层时的布设方式对工作面推进速度及煤资源开采效率存在很大影响,具体体现在过断层时割煤机切割顶底板的岩石总量以及煤资源剩余量两个方面。本文根据破顶起底法与调整割煤高度法的综合方法,主要探讨落差小于煤层厚度的迎面正断层,工作面布设方式对推进效率的影响,研究过断层切割顶底板岩石量及煤资源剩余量与工作面布设之间的关系。得出:综采工作面布设时,断层上下盘内的工作面布设长度相近,综采面倾角的设计范围应在3˚至9˚内,可有效提升工作面推进速度及提升煤资源开采效率。
Abstract: As the comprehensive mechanized coal mining working face through fault field technology and experience accumulation and the consummation, after continuous exploration and development, in view of the different types of fault structure, the corresponding fault mode, tend to be diversified, common way of coal cutting height adjustment, breaking the bottom of the jacking method, strong cut the hard way, jump mining method and comprehensive method. The arrangement mode of fully-mechanized coal mining face when it passes through the fault has great influence on the advance speed of the working face and the mining efficiency of coal resources, which is embodied in the total amount of rock in the roof and floor cut by the coal cutter and the remaining amount of coal resources when passing through the fault. According to the comprehensive method of jacking up and cutting bottom and adjusting coal height, this paper mainly discusses the impact of frontal normal fault with a drop less than the thickness of coal seam and the way of working face layout on the propulsion efficiency, and studies the relationship between rock quantity and coal resource surplus of cutting through the fault and working face layout. It is concluded that when the fully-mechanized coal face is laid out, the length of the working face is similar in the upper and lower plates of the fault, and the design range of the inclination angle of the fully-mechanized coal face should be within 3˚ to 9˚, which can effectively improve the advance speed of the working face and the mining efficiency of coal resources.
文章引用:张元, 鲁海峰, 姚多喜. 综采面过断层的布设方式探讨[J]. 矿山工程, 2020, 8(4): 461-467. https://doi.org/10.12677/ME.2020.84058

参考文献

[1] 郭守泉, 彭永伟. 综采工作面过断层技术综述[J]. 煤矿开采, 2008. 13(4): 30-31.
[2] 丛新宇. 采煤工作面过地质构造的技术措施[J]. 黑龙江科学, 2018, 9(16): 74-75.
[3] 胡雪墩. 采煤工作面过断层技术分析[J]. 陕西煤炭, 2018, 37(4): 169-170.
[4] 赵耀. 大采高综采工作面过断层技术研究[J]. 能源与节能, 2017(10): 159-160+184.
[5] 邵洪兴. 回采工作面过断层技术及实践研究[J]. 山东工业技术, 2017(12): 132.
[6] 王艳文. 煤矿井下采煤工作面过断层技术的探讨[J]. 煤, 2017, 26(5): 87-88.
[7] 高佳永. 煤矿井下采煤工作面过断层技术措施研究[J]. 中国新技术新产品, 2017(3): 47-48.
[8] 霍耀晶. 采煤工作面过断层技术研究[J]. 中国石油和化工标准与质量, 2020, 40(7): 199-200.
[9] 宋来武. 回采工作面过断层技术与实践[J]. 中州煤炭, 2015(8): 89-90+108.
[10] 周明杰, 唐杰伟, 吴绍贵, 周明非. 综采工作面安全过断层技术在实践中的应用[J]. 西部探矿工程, 2013, 25(3): 144-146.
[11] 李默然, 周连春. 综采面过断层工艺与FLAC模拟分析[J]. 中国矿山工程, 2016, 45(3): 41-45.
[12] 徐白杨, 郭昌放, 杨真, 周宏伟. 基于电磁波CT三维技术探测工作面异常构造[J]. 中国煤炭, 2016, 42(10): 23-27.
[13] 陈卫, 余芳芳, 魏中举, 刘富奎. 基于相似模拟试验的采煤工作面过断层研究[J]. 煤, 2016, 25(9): 5-6+29.
[14] 高晓岗. 回采工作面隐伏构造综合探测技术应用[J]. 能源技术与管理, 2017, 42(4): 166-167.
[15] 关金锋. 采煤工作面小构造探测及动态分析方法研究[D]: [博士学位论文]. 焦作: 河南理工大学, 2016.