国际工程承包项目汇率风险浅析及应对
Analysis and Countermeasures of Exchange Rate Risk of International Engineering Contracting Projects
摘要:
本文分析了中国工程企业在承包境外工程项目时面临的汇率风险,并针对风险的性质进行了类别划分;提出了合理投标报价外币折算、合理合同币种选择、合理利用金融衍生品等应对措施;提出了建立项目执行全过程的汇率风险管理体系建议。
Abstract:
This article analyzes the exchange rate risks faced by Chinese engineering companies when contracting overseas engineering projects, and classifies the risks according to the nature of the risks; proposes reasonable foreign currency conversion of bid quotations, reasonable contract currency selection, and reasonable use of financial derivatives; and suggests establishing an exchange rate risk management system for the entire process of project execution.
参考文献
|
[1]
|
李永宁. 略论现代企业财务风险的成因及规避对策[J]. 金融与经济, 2005(9): 72-73.
|
|
[2]
|
张翠芬. 对外承包企业如何规避外汇风险[J]. 国际商务财会, 2008, 230(2): 53-54.
|
|
[3]
|
李晓岗. 国际工程承包的外汇风险与对策[J]. 广西轻工业, 2010, 26(4): 102, 111.
|
|
[4]
|
孙晓丹, 王勃, 刘俊颖. 国际工程承包项目汇率风险应对[J]. 国际经济合作, 2008(9): 57-60.
|
|
[5]
|
何敬民. 国际工程汇率风险与防范[J]. 国际商务财会, 2008(10): 34-35.
|
|
[6]
|
斯文. 发展我国外汇衍生品市场的理论分析与政策思考[J]. 世界经济研究, 2014(5): 20-26+87.
|
|
[7]
|
张超. 国际工程承包项目汇率风险管理研究[J]. 经济研究参考, 2013(65): 83-85.
|