浅谈沙特阿美工程项目红线图的编制
A Brief Analysis of Red Line Marked-Up Drawing Preparation in Saudi Aramco Project
摘要: 在沙特阿美石油工程建设中,承包商负责根据批准的施工图来编制红线图,以记录施工现场的所有变化,业主批准后,将该红线图交由业主指定的制图中心进行项目竣工图的制作。红线图是制作工程竣工图的依据,是最真实的原始记录,是场站工程、管道工程施工实体在图纸上的反映。本文简要介绍了沙特阿美工程项目红线图编制的基本原则、程序、编制方法和技术要求。
Abstract:
During construction in Saudi Aramco project, main contractors are responsible for the preparation of red line marked-up drawings as per approved construction drawings. The red line marked-up drawings are used to record all changes from the site. All the red line marked-up drawings shall be submitted to COMPANY’s Representative for approval, then they will be delivered to Saudi Aramco’s dedicated as-built drafting center for making the project as-built drawings. The red line marked-up drawings are the basis for preparing the as-built drawings. It is the truest primary record and reflects the station project and pipeline project entity on the drawings. This paper briefly represents the basic principles, procedures, method of making and technical requirements for red line marked-up drawing preparation in Saudi Aramco Project.
参考文献
|
[1]
|
王贵川. 浅议竣工图的编制[J]. 城建档案, 2012(10): 57-59.
|
|
[2]
|
李京伟. 试论建筑工程竣工图编制的质量管理[J]. 甘肃科技, 2008, 24(15): 77-78.
|
|
[3]
|
张倍佳. 浅谈项目竣工图的管理与发展[J]. 工程管理, 2016(9): 126-126.
|
|
[4]
|
刘雪兰. 基本建设工程竣工图的编制浅谈[J]. 工程技术, 2017(4): 138-138.
|
|
[5]
|
张玲. 资料员岗位知识与专业技能[M]. 第2版. 郑州: 黄河水利出版社, 2008: 170-200.
|
|
[6]
|
王江辉. 竣工图的编制及整理[J]. 山西建筑, 2010, 36(32): 189-190.
|
|
[7]
|
周清联, 张龙波. 编制竣工图的思考[J]. 大科技, 2014(19): 14-15.
|
|
[8]
|
马慧珍. 浅谈竣工图编制存在的问题及对策[J]. 科技信息, 2009(17): 365-366.
|
|
[9]
|
李鸿雁. 对竣工图编制的探讨[J]. 山西建筑, 2006, 32(19): 191-192.
|
|
[10]
|
卢燕娴. 浅谈项目竣工图的编制工作[J]. 广东科技, 2012(9): 219-220.
|