浅谈国际工程项目索赔管理
Brief Discussion on Claims Management of International Engineering Projects
DOI: 10.12677/JOGT.2020.424159, PDF,   
作者: 佟建平, 刘晓亮, 叶 刚:中国石油管道局工程有限公司国际事业部,河北 廊坊
关键词: 国际工程索赔原因计算方法International Engineering Claims Causes Calculations Methods
摘要: 本文通过研究索赔的定义和特点,分析索赔产生的原因及分类,并对索赔的一般程序进行了介绍,对于索赔的工期延长和费用索赔等计算方法进行了介绍,并对工期索赔涉及到的任意工期和建设性赶工也进行了基本介绍,最后提出了索赔成功的几点基本原则和建议。
Abstract: In this paper we study the characteristics of claims in international projects, analyze the causes and classification of claims, summarize the general procedures of claims, introduce the calculation methods of extension of construction period and cost claims, and also introduce the arbitrary construction period and constructive acceleration involved in the claim for construction period, and finally put forward some basic principles and suggestions for successful claims.
文章引用:佟建平, 刘晓亮, 叶刚. 浅谈国际工程项目索赔管理[J]. 石油天然气学报, 2020, 42(4): 391-400. https://doi.org/10.12677/JOGT.2020.424159

参考文献

[1] 崔军. FIDIC合同原理和实务[M]. 北京: 机械工业出版社, 2011.
[2] 何美兰. 论建设工程索赔[J]. 露天采矿技术, 2014(7): 83-85, 89.
[3] 郭娟. 浅谈建设工程施工索赔技巧[J]. 建筑技术开发, 2019(S1): 20.
[4] 成虎. 建设工程合同管理与索赔[M]. 第4版. 南京: 东南大学出版社, 2008.
[5] 建岩. 工程索赔中工期延误的计算[J]. 建筑经济, 1993(3): 12-13.
[6] 梁鑑, 陈勇强. 国际工程施工索赔[M]. 第3版. 北京: 中国建筑工业出版社, 2011.
[7] Roger Gibson. 工期索赔[M]. 崔军, 译. 北京: 机械工业出版社, 2010.
[8] 袁华之. 建设工程索赔与反索赔[M]. 北京: 法律出版社, 2016.