|
[1]
|
朱忠隆, 张庆贺, 易宏传. 软土隧道纵向地表沉降的随机预测方法[J]. 岩土力学, 2001, 22(1): 56-59.
|
|
[2]
|
魏纲, 张世民, 齐静静, 姚宁. 盾构隧道施工引起的地面变形计算方法研究[J]. 岩石力学与工程学报, 2006, 25(z1): 3317-3323.
|
|
[3]
|
Loganathan, N. and Poulos, H.G. (1998) Analytical Prediction for Tunneling-Induced Ground Movements in Clays. Journal of Geotechnical & Geoenvironmental Engineering, 124, 846-856.
[Google Scholar] [CrossRef]
|
|
[4]
|
Lee, K.M., Rowe, R.K. and Lo, K.Y. (1992) Subsidence Owing to Tunneling, I: Estimating the Gap Parameter. Canadian Geotechnical Journal, 29, 929-940. [Google Scholar] [CrossRef]
|
|
[5]
|
王铁生, 张利平, 华锡生, 张冰. 隧道地表沉降预测的时变参数灰序模型TGM-AR [J]. 河海大学学报(自然科学版), 2007, 35(6): 655-658.
|
|
[6]
|
Zhang, Z.X., Liu, C., Huang, X., Kwok, C.Y. and Teng, L. (2016) Three-Dimensional Finite-Element Analysis on Ground Responses during Twin-Tunnel Construction Using the URUP Method. Tunneling and Underground Space Technology, 58, 133-146. [Google Scholar] [CrossRef]
|
|
[7]
|
Liu, C., Zhang, Z.X., Kwok, C.Y, Jiang, H.Q. and Teng, L. (2017) Ground Responses to Tunneling in Soft Soil Using the URUP Method. Journal of Geotechnical and Geoenvironmental Engineering, 143, Article ID: 04017023.
|
|
[8]
|
张子新, 胡文, 刘超, 滕丽. 地面出入式盾构法隧道新技术大型模型试验与工程应用研究[J]. 岩石力学与工程学报, 2013, 32(11): 2161-2169.
|
|
[9]
|
高守栋, 刘超, 张子新, 刘海. 地面出入式盾构隧道施工对周边地层扰动研究[J]. 地下空间与工程学报, 2020, 16(3): 903-914.
|
|
[10]
|
高昂, 张孟喜, 蒋华钦, 梁勇. 地面出入式盾构法隧道施工同步注浆工程应用研究[J]. 岩石力学与工程学报, 2016, 35(9): 1871-1883.
|
|
[11]
|
滕丽. 地面出入式盾构法隧道技术(GPST)施工变形监测与分析研究[J]. 中国市政工程, 2016(3): 100-103.
|
|
[12]
|
吴惠明, 黄俊, 张冠军, 滕丽. 地面出入式盾构法隧道同步注浆工艺模拟试验[J]. 中国市政工程, 2013(6): 80-82.
|
|
[13]
|
姜弘, 张银屏, 丁文其. 地面出入式盾构隧道(GPST)设计综合技术研究[C]. 第七届中国公路科技创新高层论坛论文集. 北京: 人民交通出版社, 2015: 580-585.
|
|
[14]
|
侯伟, 韩煊, 王法, 尹宏磊. 采用不同本构模型对盾构施工引起地层位移的数值模拟研究[J]. 隧道建设, 2013, 33(12): 989-994.
|
|
[15]
|
Verruijt, A. and Booker, J.R. (1996) Surface Settlements Due to Deformation of a Tunnel in an Elastic Half Plane. Géotechnique, 46, 753-756. [Google Scholar] [CrossRef]
|