对株梓洞尾矿库加高扩容工程勘察方法及稳定性分析的建议
Suggestions on Investigation Method and Stability Analysis of Heightening and Capacity Expansion Project of Zhuzidong Tailings Pond
DOI: 10.12677/ME.2022.102023, PDF,   
作者: 林立仁:湖南省遥感地质调查监测所,湖南 长沙;陈七五:湖南大学设计研究院有限公司,湖南 长沙
关键词: 尾矿库扩容工程勘察稳定性分析评价方法建议Tailings Pond Expansion Engineering Investigation Stability Analysis and EvaluationMethod Suggestion
摘要: 本文通过对株梓洞尾矿库加高扩容工程进行了工程地质勘察,采用了工程地质测绘、工程钻探、室内岩土试验、标准贯入试验、动力触探试验及十字板剪切试验等工作方法,对尾矿库坝址进行了稳定性计算及综合分析评价,提出了对尾矿库加高扩容工程勘察工作方法的优化建议。
Abstract: In this paper, the engineering geological survey is carried out for the heightening and capacity expansion project of Zhuzidong tailings pond; engineering geological mapping, engineering drilling, indoor geotechnical test, standard penetration test, dynamic penetration test and vane shear test are adopted; the stability calculation and comprehensive analysis and evaluation of tailings pond dam site are carried out; the optimization suggestions on the investigation method of tailings pond heightening and capacity expansion engineering are put forward.
文章引用:林立仁, 陈七五. 对株梓洞尾矿库加高扩容工程勘察方法及稳定性分析的建议[J]. 矿山工程, 2022, 10(2): 188-199. https://doi.org/10.12677/ME.2022.102023

参考文献

[1] 国家标准. GB50547-2010. 尾矿堆积坝岩土工程技术规范[S]. 北京: 中华人民共和国住房和城乡建设部, 2010.
[2] 国家标准. GB50863-2013. 尾矿设施设计规范[S]. 北京: 中华人民共和国住房和城乡建设部, 2013.
[3] 陈七五, 林立仁, 靳朝明. 湖南省玉坤矿业集团有限公司株梓洞尾矿库加高扩容工程工程地质勘察报告[R]. 长沙: 湖南鑫湘物探工程有限公司, 2017.
[4] 国家标准. GB50021-2001. 岩土工程勘察规范[S]. 北京: 中华人民共和国建设部, 2009.
[5] 国家标准. GB50011-2010. 建筑抗震设计规范[S]. 北京: 中华人民共和国住房和城乡建设部, 2016.
[6] 国家标准. GB/T50123-2019. 土工试验方法标准[S]. 北京: 中华人民共和国住房和城乡建设部, 2019.