|
[1]
|
LITTLE, J. D. C. The use of storage water in a hydroelectric system. Journal of the Operations Research Society of America, 1955, 3(2): 187-197. [Google Scholar] [CrossRef]
|
|
[2]
|
HALL, W. A., BUTCHER, W. S. and ESOGBUE, A. Optimization of the operation of a multi-purpose reservoir. Water Resources Research, 1969, 8(2): 471-485. [Google Scholar] [CrossRef]
|
|
[3]
|
LARSON, R. E., KECKLERV, W. G. Applications of dynamic pro-gramming to control of water resource systems. International Federation of Automatic Control, 1969, 5(l): 15-26. [Google Scholar] [CrossRef]
|
|
[4]
|
DEB, K., PRATAP, A., AGARWAL, S., et al. A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation, 2002, 6(2): 182-197. [Google Scholar] [CrossRef]
|
|
[5]
|
TAN, Q. F., WEN, X., FANG, G. H., et al. Long-term optimal operation of cascade hydropower stations based on the utility function of the carryover potential energy. Journal of Hydrology, 2020, 580: 124359.
|
|
[6]
|
李亮, 黄强, 肖燕, 肖志娟. DPSA和大系统分解协调在梯级水电站短期优化调度中的应用研究[J]. 西北农林科技大学学报(自然科学版), 2005(10): 125-128+133.
LI Liang, HUANG Qiang, XIAO Yan and XIAO Zhijuan. The application research of DPSA and large-scale system decomposition-coordination for cascaded hydroelectric short-term optimal scheduling. Journal of Northwest A&F University (Natural Science Edition), 2005(10): 125-128+133. (in Chinese)
|
|
[7]
|
周佳, 马光文, 张志刚. 基于改进POA算法的雅砻江梯级水电站群中长期优化调度研究[J]. 水力发电学报, 2010, 29(3): 18-22.
ZHOU Jia, MA Guangwen and ZHANG Zhigang. Study on the mid-long term optimal dispatching of cascaded hydropower stations on Yalong river based on POA modified adaptive algorithm. Journal of Hydroelectric Engineering, 2010, 29(3): 18-22. (in Chinese)
|
|
[8]
|
许银山, 梅亚东, 杨娜, 雍婷. 大规模混联水库群长期优化调度[J]. 水电自动化与大坝监测, 2010, 34(4): 58-63.
XU Yinshan, MEI Yadong, YANG Na and YONG Ting. Optimal operation method of large-scale multi-reservoir group. Hydropower Automation and Dam Monitoring, 2010, 34(4): 58-63. (in Chinese)
|
|
[9]
|
张剑亭, 郭生练, 陈柯兵, 何绍坤. 基于信息熵的梯级水库联合优化调度增益分配法[J]. 水力发电学报, 2020, 39(2): 94-102.
ZHANG Jianting, GUO Shenglian, CHEN Kebing and HE Shaokun. Benefit distribution method based on information entropy for optimal joint operation of cascade reservoirs. Journal of Hydroelectric Engineering, 2020, 39(2): 94-102. (in Chinese)
|
|
[10]
|
邓乐乐, 郭生练, 何绍坤, 张剑亭, 陈柯兵, 巴欢欢. 雅砻江梯级电站发电优化调度研究[J]. 水资源研究, 2019, 8(2): 109-116.
DENG Lele, GUO Shenglian, HE Shaokun, ZHANG Jianting, CHEN Kebing and BA Huanhuan. Optimal operation of Yalong River’s cascade reservoirs. Journal of Water Resources Research, 2019, 8(2): 109-116. (in Chinese)
|