|
[1]
|
Mejlænder-Larsen, Ø. (2017) Using a Change Control System and Building Information Modeling to Manage Change in Design. Architectural Engineering and Design Management, 13, 39-51. [Google Scholar] [CrossRef]
|
|
[2]
|
Jin, J., Hwang, K.E. and Kim, I. (2020) A Study on the Constructivism Learning Method for BIM/IPD Collaboration Education. Applied Sciences, 10, 51-69. [Google Scholar] [CrossRef]
|
|
[3]
|
席新元. BIM技术在建筑结构设计中的应用[J]. 工程技术研究, 2020, 5(15): 201-202.
|
|
[4]
|
王文军. BIM技术在政府和社会资本合作项目造价管理中的应用[J]. 安阳工学院学报, 2020, 19(2): 86-88.
|
|
[5]
|
王建会, 张隆, 娄树华, 乔文涛. 基于BIM协同应用平台的施工信息化管理[J]. 建筑技术开发, 2021, 48(6): 98-100.
|
|
[6]
|
Marwan, A., Collier, Z.A. and Lambert, J.H. (2021) Risk-Based Priority Setting for Large-Scale Access Management Programs with Uncertain Mobility Benefits and Costs. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 7, Article ID 04020046. [Google Scholar] [CrossRef]
|
|
[7]
|
Hasan, R., Chowdhury, S.A. and Akter, J. (2021) Construction Project Monitoring: The Cost and Schedule Control by Earned Value Method (EVM). Journal of Technology Man-agement and Business, 8, 1-9.
|
|
[8]
|
张虹. WD企业房地产项目成本控制管理问题研究[D]: [硕士学位论文]. 武汉: 湖北工业大学, 2020.
|
|
[9]
|
刘鹏. BIM技术在工程管理与施工成本控制中的应用[J]. 中华建设, 2020(1): 62-63.
|
|
[10]
|
杨艳, 马建疆, 李祎. 大智移云下建筑施工企业项目成本控制系统[J/OL]. 会计之友, 2020(7): 23-31.
|
|
[11]
|
李雅婷. BIM技术应用障碍研究[J]. 广东土木与建筑, 2018, 25(7): 79-82. [Google Scholar] [CrossRef]
|
|
[12]
|
黄华. 建设工程设计阶段造价控制新方式——基于BIM的建设工程造价管理[J]. 内江师范学院学报, 2010, 25(10): 58-61.
|
|
[13]
|
王广斌, 张洋, 谭丹. 基于BIM的工程项目成本核算理论及实现方法研究[J]. 科技进步与对策, 2009, 26(21): 47-49.
|
|
[14]
|
李静, 方后春, 罗春贺. 基于BIM的全过程造价管理研究[J]. 建筑经济, 2012(9): 96-100. [Google Scholar] [CrossRef]
|