| [1] | 周惠成, 王本德. 水库汛限水位动态方法研究[M]. 辽宁: 大连理工大学版社, 2006. 
ZHOU Hui-cheng, WANG Ben-de. Research on dynamic control of reservoir normal elevation in flood season. Liaoning: Dalian University of Technology Press, 2006. (in Chinese) | 
                     
                                
                                    
                                        | [2] | 郭生练, 李响, 刘心愿, 等. 三峡水库汛限水位动态控制关键技术研究[M]. 北京: 中国水利水电出版社, 2011. 
GUO Sheng-lian, LI Xiang, LIU Xin-yuan, et al. Key technological problems of dynamic control of flood limited water level for Three Gorges Reservoir. Beijing: Chinese Water Resources and Hydropower Press, 2011. (in Chinese) | 
                     
                                
                                    
                                        | [3] | 郭生练, 刘攀. 建立水库汛限水位动态控制推进机制的建议[J]. 中国水利, 2008, 9: 1-3. 
GUO Sheng-lian, LIU Pan. Suggestion of promoting dynamic control mechanism of water level of reservoir in flood season. China Water Resources, 2008, 9: 1-3. (in Chinese) | 
                     
                                
                                    
                                        | [4] | YUN, R., SINGH, V. P. Multiple duration limited water level and dynamic limited water level for flood control, with implication on water supply. Journal of Hydrology, 2008, 354: 160-170. | 
                     
                                
                                    
                                        | [5] | 李玮, 郭生练, 刘攀, 等. 梯级水库汛限水位动态控制模型研究及运用[J]. 水力发电学报, 2008, 27(2): 22-28. 
LI Wei, GUO Sheng-lian, LIU Pan, et al. Dynamic control model for limiting level during flood season of cascade reservoirs operation. Journal of Hydroelectric Engineering, 2008, 27(2): 22-28. (in Chinese) | 
                     
                                
                                    
                                        | [6] | 刘攀, 郭生练, 王才君, 等. 水库汛限水位实时动态控制模型研究[J]. 水力发电, 2005, 31(1): 8-11. 
LIU Pan, GUO Sheng-lian, WANG Cai-jun, et al. Real-time dynamic control model for reservoir flood limit water level operation. Water Power, 2005, 31(1): 8-11. (in Chinese) | 
                     
                                
                                    
                                        | [7] | 张改红, 周惠成, 王本德, 等. 水库汛限水位实时动态控制研究及风险分析[J]. 水力发电学报, 2009, 29(1): 51-55. 
ZHANG Gai-hong, ZHOU Hui-cheng, WANG Ben-de, et al. Real-time dynamic control of the limited water level of reservoir in flood period and its risk analysis. Journal of Hydroelectric Engineering, 2009, 29(1): 51-55. (in Chinese) | 
                     
                                
                                    
                                        | [8] | BEVEN, K., BINLEY, A. Future of distributed models: Model calibration and uncertainty prediction. Hydrological Processes, 1992, 6(3): 279-298. | 
                     
                                
                                    
                                        | [9] | 梁忠民, 戴荣, 李彬权. 基于贝叶斯理论的水文不确定性分析研究进展[J]. 水科学进展, 2010, 21(2): 274-281. 
LIANG Zhong-min, DAI Rong and LI Bin-quan. A review of hydrological uncertainty analysis based on Bayesian theory. Advances in Water Science, 2010, 21(2): 274-281. (in Chinese) | 
                     
                                
                                    
                                        | [10] | 刘艳丽, 王国利, 周惠成. 洪水预报不确定性分析及其在水库调度决策中的应用研究[J]. 水力发电学报, 2010, 29(1): 92-96. 
LIU Yan-li, WANG Guo-li and ZHOU Hui-cheng. Uncertainty analysis of flood forecasting and its application to reservoir op-eration. Journal of Hydroelectric Engineering, 2010, 29(1): 92- 96. (in Chinese) | 
                     
                                
                                    
                                        | [11] | MEDIERO, L., GARROTE, L. and MARTÍN-CARRASCO, F. A probabilistic model to support reservoir operation decisions during flash floods. Hydrological Science Journal, 2007, 52(3): 523-537. | 
                     
                                
                                    
                                        | [12] | KRZYSZTOFOWICZ, R., KELLY, K. S. Hydrologic uncer- tainty processor for probabilistic river stage forecasting. Water Resources Research, 2000, 36(11): 3265-3277. | 
                     
                                
                                    
                                        | [13] | 李向阳, 程春田, 林剑艺. 基于BP 神经网络的贝叶斯概率水文预报模型[J]. 水利学报, 2006, 37(3): 354-359. 
LI Xiang-yang, CHENG Chun-tian and LIN Jian-yi. Bayesian probabilistic forecasting model based on BP ANN. Journal of Hydraulic Engineering, 2006, 37(3): 354-359. (in Chinese) | 
                     
                                
                                    
                                        | [14] | 邢贞相, 芮孝芳, 崔海燕, 等. 基于AM-MCMC算法的贝叶斯概率洪水预报模型[J]. 水利学报, 2007, 38(12): 1500-1506. 
XING Zheng-xiang, RUI Xiao-fang, CUI Hai-yan, et al. Bayesian probabilistic flood forecasting model based on adaptive metropo-lis-MCMC algorithm. Journal of Hydraulic Engineering, 2007, 38(12): 1500-1506. (in Chinese) | 
                     
                                
                                    
                                        | [15] | 李响, 郭生练, 刘攀, 万民, 刘心愿. 考虑入库洪水不确定性的三峡水库汛限水位动态控制域研究[J]. 四川大学学报(工程科学版), 2010, 42(3): 49-55. 
LI Xiang, GUO Sheng-lian, LIU Pan, WAN Min and LIU Xinyuan. The dynamic control bound of flood limited water level considering inflow uncertainty in Three Gorges Reservoir. Journal of Sichuan University (Engineering Science Edition), 2010, 42(3): 49-55. (in Chinese) |