|
[1]
|
Goldratt, E.M. (1997) Critical Chain. The North River Press, New York.
|
|
[2]
|
Forcada, N., Gangolells, M., Casals, M. and Macarulla, M. (2017) Factors Affecting Rework Costs in Construction. Journal of Construction Engineering and Management, 143, Article ID: 04017032. [Google Scholar] [CrossRef]
|
|
[3]
|
肖宇. 基于项目返工的关键设计结构矩阵进度优化研究[D]: [博士学位论文]. 上海: 同济大学, 2016.
|
|
[4]
|
Raz, T., Barnes, R. and Dvir, D. (2003) A Critical Look at Critical Chain Project Management. Project Management Journal, 34, 24-32. [Google Scholar] [CrossRef]
|
|
[5]
|
张静文, 李若楠. 关键链项目调度方法研究评述综述与评论[J]. 控制与决策, 2013, 28(9): 1281-1287.
|
|
[6]
|
Herroelen, W. and Leus, R. (2001) On the Merits and Pitfalls of Critical Chain Scheduling. Journal of Operations Management, 19, 559-577. [Google Scholar] [CrossRef]
|
|
[7]
|
Newbold, R.C. (1998) Project Management in the Fast Lane: Applying the Theory of Constraints. The St. Lucie Press, Boca Raton.
|
|
[8]
|
Herroelen, W. and Leus, R. (2005) Project Scheduling under Uncertainty: Survey and Research Potentials. European Journal of Operational Research, 165, 289-306. [Google Scholar] [CrossRef]
|
|
[9]
|
Tukel, O.I., Rom, W.O. and Eksioglu, S.D. (2006) An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling. European Journal of Operational Research, 172, 401-416. [Google Scholar] [CrossRef]
|
|
[10]
|
Icmeli, O. and Erenguc, S.S. (1996) A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows. Management Science, 42, 1395-1408. [Google Scholar] [CrossRef]
|
|
[11]
|
Zhao, Z.Y., You, W.Y. and Zuo, J. (2010) Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty. Journal of Construction Engineering and Management, 136, 1056-1060. [Google Scholar] [CrossRef]
|
|
[12]
|
Leach, L.P. (2006) Critical Chain Project Management. 2nd Edition, Artech House, London.
|
|
[13]
|
别黎, 崔南方. 关键链动态缓冲监控方法研究[J]. 中国管理科学, 2010, 18(6): 97-103.
|
|
[14]
|
Hu, X.J., Cui, N.F., Demeulemeester, E. and Bie, L. (2016) Incorporation of Activity Sensitivity Measures into Buffer Management to Manage Project Schedule Risk. European Journal of Operational Research, 249, 717-727. [Google Scholar] [CrossRef]
|
|
[15]
|
Zhang, J.G., Jia, S.K. and Diaz, E. (2018) Dynamic Monitoring and Control of a Critical Chain Project Based on Phase Buffer Allocation. Journal of the Operational Research Society, 69, 1966-1977. [Google Scholar] [CrossRef]
|
|
[16]
|
Hu, X.J., Cui, N.F. and Demeulemeester, E. (2015) Effective Expediting to Improve Project Due Date and Cost Performance through Buffer Management. International Journal of Production Research, 53, 1460-1471. [Google Scholar] [CrossRef]
|
|
[17]
|
Steward, D.V. (1981) The Design Structure System: A Method for Managing the Design of Complex Systems. IEEE Transactions on Engineering Management, 28, 71-74. [Google Scholar] [CrossRef]
|
|
[18]
|
Steward, D.V. (1981) Systems Analysis and Management: Structure, Strategy, and Design. Petrocelli Books, Princeton.
|
|
[19]
|
Eppinger, S.D. and Browning, T.R. (2012) Design Structure Matrix Methods and Applications. MIT Press, Cambridge. [Google Scholar] [CrossRef]
|
|
[20]
|
Browning, T.R. (2016) Design Structure Matrix Extensions and Innovations: A Survey and New Opportunities. IEEE Transactions on Engineering Management, 63, 27-52. [Google Scholar] [CrossRef]
|
|
[21]
|
Smith, R.P. and Eppinger, S.D. (1997) A Predictive Model of Sequential Iteration in Engineering Design. Management Science, 43, 1104-1120. [Google Scholar] [CrossRef]
|
|
[22]
|
Browning, T.R. and Eppinger, S.D. (2002) Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development. IEEE Transactions on Engineering Management, 49, 428-442. [Google Scholar] [CrossRef]
|
|
[23]
|
Cho, S.H. and Eppinger, S.D. (2005) A Simulation-Based Process Model for Managing Complex Design Projects. IEEE Transactions on Engineering Management, 52, 316-328. [Google Scholar] [CrossRef]
|
|
[24]
|
Wang, W.C., Liu, J.J. and Liao, T.S. (2006) Modeling of Design Iterations through Simulation. Automation in Construction, 15, 589-603. [Google Scholar] [CrossRef]
|
|
[25]
|
Lévárdy, V. and Browning, T.R. (2009) An Adaptive Process Model to Support Product Development Project Management. IEEE Transactions on Engineering Management, 56, 600-620. [Google Scholar] [CrossRef]
|
|
[26]
|
Steyn, H. (2002) Project Management Applications of the Theory of Constraints beyond Critical Chain Scheduling. International Journal of Project Management, 20, 75-80. [Google Scholar] [CrossRef]
|
|
[27]
|
Martens, A. and Vanhoucke, M. (2017) A Buffer Control Method for Top-Down Project Control. European Journal of Operational Research, 262, 274-286. [Google Scholar] [CrossRef]
|
|
[28]
|
Baldwin, A., Austin, S., Hassan, T. and Thorpe, A. (1998) Planning Building Design by Simulating Information Flow. Automation in Construction, 8, 149-163. [Google Scholar] [CrossRef]
|
|
[29]
|
Lin, J., Chai, K.H., Wong, Y.S. and Brombacher, A.C. (2008) A Dynamic Model for Managing Overlapped Iterative Product Development. European Journal of Operational Research, 185, 378-392. [Google Scholar] [CrossRef]
|
|
[30]
|
Eppinger, S.D., Whitney, D.E., Smith, R.P. and Gebala, D.A. (1994) A Model-Based Method for Organizing Tasks in Product Development. Research in Engineering Design, 6, 1-13. [Google Scholar] [CrossRef]
|
|
[31]
|
Zhang, J.G., Song X.W. and Diaz, E. (2016) Project Buffer Sizing of a Critical Chain Based on Comprehensive Resource Tightness. European Journal of Operational Research, 248, 174-182. [Google Scholar] [CrossRef]
|
|
[32]
|
郝可可. 关键设计结构矩阵缓冲区设置和计划生成算法研究[D]: [博士学位论文]. 上海: 同济大学, 2019.
|
|
[33]
|
Meier, C., Yassine, A.A. and Browning, T.R. (2007) Design Process Sequencing with Competent Genetic Algorithms. Journal of Mechanical Design, 129, 566-585. [Google Scholar] [CrossRef]
|
|
[34]
|
Brindle, A. (1981) Genetic Algorithms for Function Optimization. Ph.D. Thesis, University of Alberta, Edmonton.
|
|
[35]
|
Murata T. and Ishibuchi H. (1994) Performance Evaluation of Genetic Algorithms for Flow Shop Scheduling Problems. Proceedings of the First IEEE Conference on Genetic Algorithms and Their Applications, Orlando, 27-29 June 1994, 812-817.
|
|
[36]
|
Zhang, J.G., Song, X.W., Chen, H.Y. and Shi, R.X. (2015) Optimisation of Critical Chain Sequencing Based on Activities’ Information Flow Interactions. International Journal of Production Research, 53, 6231-6241. [Google Scholar] [CrossRef]
|
|
[37]
|
Ma, G.F., Jiang, S., Zhu, T.C. and Jia, J.Y. (2019) A Novel Method of Developing Construction Projects Schedule under Rework Scenarios. Sustainability, 11, Article 5710. [Google Scholar] [CrossRef]
|
|
[38]
|
Dehghan, R. and Ruwnapura, J.Y. (2014) Model of Trade-Off between Overlapping and Rework of Design Activities. Journal of Construction Engineering and Management, 140, Article ID: 04013043. [Google Scholar] [CrossRef]
|
|
[39]
|
朱天成. 基于不确定返工情形的项目进度关键设计结构矩阵(CCDSM)研究[D]: [博士学位论文]. 上海: 同济大学, 2017.
|
|
[40]
|
Martens, A. and Vanhoucke, M. (2019) The Impact of Applying Effort to Reduce Activity Variability on the Project Time and Cost Performance. European Journal of Operational Research, 277, 442-453. [Google Scholar] [CrossRef]
|
|
[41]
|
Vanhoucke, M. (2011) On the Dynamic Use of Project Performance and Schedule Risk Information during Project Tracking. Omega, 39, 416-426. [Google Scholar] [CrossRef]
|
|
[42]
|
Xiao, L., Bie, L. and Bai, X. (2021) Controlling the Schedule Risk in Green Building Projects: Buffer Management Framework with Activity Dependence. Journal of Cleaner Production, 278, Article ID: 123852. [Google Scholar] [CrossRef]
|
|
[43]
|
Demeulemeester, E. and Herroelen, W. (1992) A Branch-And-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem. Management Science, 38, 1803-1818. [Google Scholar] [CrossRef]
|
|
[44]
|
Ma, G.F., Hao, K.K., Xiao, Y. and Zhu, T.C. (2019) Critical Chain Design Structure Matrix Method for Construction Project Scheduling under Rework Scenarios. Mathematical Problems in Engineering, 2019, Article ID: 1595628. [Google Scholar] [CrossRef]
|
|
[45]
|
Ma, G.F., Wu, M., Hao, K.K. and Shang, S.S. (2021) A DSM-Based CCPM-MPL Representation Method for Project Scheduling under Rework Scenarios. Advances in Civil Engineering, 2021, Article ID: 887830. [Google Scholar] [CrossRef]
|
|
[46]
|
Eppinger, S.D., Bonelli, S. and Gonzalez, A.M. (2013) Managing Iterations in the Modular Real Estate Development Process. In: Scheurmann, E., et al., Eds., Reducing Risk in Innovation, Hanser, Melbourne, 37-44. [Google Scholar] [CrossRef]
|
|
[47]
|
Vanhoucke, M. (2010) Using Activity Sensitivity and Network Topology Information to Monitor Project Time Performance. Omega, 38, 359-370. [Google Scholar] [CrossRef]
|