港池开挖对高桩梁板码头影响的数值分析
Numerical Analysis of the Impact of Harbor Basin Excavation of High-Piled Beam Plate Wharf
DOI: 10.12677/hjce.2024.134043, PDF,   
作者: 周臻臻, 郑永来, 崔 坤, 庞绍正:同济大学土木工程学院水利工程系,上海;施洪景, 陈 赟:中建港航局集团有限公司,上海
关键词: 高桩码头港池开挖被动桩数值模拟结构与土相互作用High-Piled Wharf Harbor Basin Excavation Passive Piles Numerical Simulation Interaction of Structure and Soil
摘要: 通过高桩梁板码头结构数值模拟与分析,探讨了开挖过程中土体卸荷对高桩码头群桩的影响。使用PLAXIS-3D有限元软件构建了三维模型,考虑了地基土层、开挖工况、桩基布置方式的影响并通过模拟分析了不同阶段的桩基结构弯矩、位移等关键参数。研究表明:发现随着开挖深度增加,桩身水平位移和沉降量增加,并与开挖深度呈线性关系。同时,开挖过程会导致码头桩基产生明显弯矩,呈现“弓”字形变化。
Abstract: Through numerical simulation and analysis of high-piled wharf structures, the influence of soil unloading during excavation on the piles of high-piled wharves was investigated. A three-dimensional model was constructed using PLAXIS-3D finite element software, considering the effects of foundation soil layers, excavation processes, and pile layout methods. Key parameters such as bending moment and displacement of pile foundations at different stages were analyzed through simulation. The study revealed that with increasing excavation depth, horizontal displacement and settlement of the piles increased linearly. Additionally, excavation processes led to significant bending moments in the wharf piles, exhibiting a “bow” shaped variation.
文章引用:周臻臻, 郑永来, 施洪景, 陈赟, 崔坤, 庞绍正. 港池开挖对高桩梁板码头影响的数值分析[J]. 土木工程, 2024, 13(4): 383-388. https://doi.org/10.12677/hjce.2024.134043

参考文献

[1] 张忠苗. 桩基工程[M]. 北京: 中国建筑工业出版社, 2000.
[2] Poulos, H.G. and Chen, L.T. (1997) Pile Response Due to Excavation-Induced Lateral Soil Movement. Journal of Geotechnical and Geo-Environmental Engineering, 123, 94-99. [Google Scholar] [CrossRef
[3] 黄茂松, 任青, 王卫东, 等. 深层开挖条件下抗拔桩极限承载力分析[J]. 岩土工程学报, 2007(11): 1689-1695.
[4] 卫凌云, 秦胜伍, 陈慧娥. 基坑开挖对单桩及群桩回弹位移的影响分析[J]. 吉林大学学报(地球科学版), 2014, 44(2): 584-590. [Google Scholar] [CrossRef