|
[1]
|
袁振民, 张琦, 常远, 等. 耦合协调度视角下装配式建筑精益施工能力与效益关系评估研究[J]. 系统工程理论与实践, 2022, 42(9): 2540-2550.
|
|
[2]
|
陈伟, 孙翔君, 王朝晖, 等. 装配式建筑预制构件质量链管控SD模型[J]. 土木工程与管理学报, 2020, 37(6): 14-20.
|
|
[3]
|
Li, C.Z., Chen, Z., Xue, F., et al. (2021) A Blockchain-and IoT-Based Smart Product-Service System for the Sustainability of Prefabricated Housing Construction. Journal of Cleaner Production, 286, Article ID: 125391. [Google Scholar] [CrossRef]
|
|
[4]
|
Aloini, D., Dulmin, R., Mininno, V., et al. (2012) Supply Chain Management: A Review of Implementation Risks in the Construction Industry. Business Process Management Journal, 18, 735-761. [Google Scholar] [CrossRef]
|
|
[5]
|
Tang, X., Xu, P. and Cui, S. (2019) Applying the Bi-Level Programming Model Based on Time Satisfaction to Optimize Transportation Scheduling of Prefabricated Components. 2019 8th International Conference on Industrial Technology and Management (ICITM), Cambridge, 2-4 March 2019, 280-284. [Google Scholar] [CrossRef]
|
|
[6]
|
Fang, Y. and Ng, S.T. (2019) Genetic Algorithm for Determining the Construction Logistics of Precast Components. Engineering, Construction and Architectural Management, 26, 2289-2306. [Google Scholar] [CrossRef]
|
|
[7]
|
Hsu, P.Y., Angeloudis, P. and Aurisicchio, M. (2018) Optimal Logistics Planning for Modular Construction Using Two-Stage Stochastic Programming. Automation in Construction, 94, 47-61. [Google Scholar] [CrossRef]
|
|
[8]
|
Almashaqbeh, M. and El-Rayes, K. (2021) Minimizing Transportation Cost of Prefabricated Modules in Modular Construction Projects. Engineering, Construction and Architectural Management, 29, 3847-3867. [Google Scholar] [CrossRef]
|
|
[9]
|
Chen, J.H., Yan, S., Tai, H.W., et al. (2017) Optimizing Profit and Logistics for Precast Concrete Production. Canadian Journal of Civil Engineering, 44, 393-406. [Google Scholar] [CrossRef]
|
|
[10]
|
汪和平, 齐欣然. 基于双层规划的预制构件配送成本优化研究[J]. 工业工程与管理, 2021, 26(6): 27-35.
|
|
[11]
|
Zhai, Y., Chen, K., Zhou, J.X., et al. (2019) An Internet of Things-Enabled BIM Platform for Modular Integrated Construction: A Case Study in Hong Kong. Advanced Engineering Informatics, 42, Article ID: 100997. [Google Scholar] [CrossRef]
|
|
[12]
|
Ahn, S.J., Han, S., Altaf, M.S., et al. (2022) Integrating Off-Site and On-Site Panelized Construction Schedules Using Fleet Dispatching. Automation in Construction, 137, Article ID: 104201. [Google Scholar] [CrossRef]
|
|
[13]
|
Song, J., Haas, C.T., Caldas, C., et al. (2006) Automating the Task of Tracking the Delivery and Receipt of Fabricated Pipe Spools in Industrial Projects. Automation in Construction, 15, 166-177. [Google Scholar] [CrossRef]
|
|
[14]
|
Yang, Y., Pan, M., Pan, W., et al. (2021) Sources of Uncertainties in Offsite Logistics of Modular Construction for High-Rise Building Projects. Journal of Management in Engineering, 37, Article ID: 04021011. [Google Scholar] [CrossRef]
|
|
[15]
|
朱帮助, 唐隽捷, 江民星, 等. 基于系统动力学的碳市场风险模拟与调控研究[J]. 系统工程理论与实践, 2022, 42(7): 1859-1872.
|
|
[16]
|
王翠霞. 生态农业规模化经营策略的系统动力学仿真分析[J]. 系统工程理论与实践, 2015, 35(12): 3171-3181.
|
|
[17]
|
汪小京, 刘志学, 徐娟. 基于系统动力学的第三方物流管理库存模型[J]. 系统管理学报, 2016, 25(2): 317-325.
|
|
[18]
|
Ahn, S.J., Han, S., Altaf, M.S., et al. (2022) Integrating Off-Site and On-Site Panelized Construction Schedules Using Fleet Dispatching. Automation in Construction, 137, Article ID: 104201. [Google Scholar] [CrossRef]
|
|
[19]
|
Lee, Y., Kim, J.I., Khanzode, A., et al. (2021) Empirical Study of Identifying Logistical Problems in Prefabricated Interior Wall Panel Construction. Journal of Management in Engineering, 37, Article ID: 05021002. [Google Scholar] [CrossRef]
|
|
[20]
|
Li, J., Han, Y., Duan, P., et al. (2020) Meta-Heuristic Algorithm for Solving Vehicle Routing Problems with Time Windows and Synchronized Visit Constraints in Prefabricated Systems. Journal of Cleaner Production, 250, Article ID: 119464. [Google Scholar] [CrossRef]
|