P-M曲线计算异型桥墩正截面抗压承载力P-M Curve Calculation of the Normal Section Compressive Bearing Capacity of Special-Shaped Bridge Piers
王升堂, 李兆阳, 唐小清, 穆胜利
土木工程Vol.12 No.8, 全文下载: PDF HTML XML DOI:10.12677/HJCE.2023.128132, August 28 2023
带时间窗口的单工件排序问题The Scheduling Problem of Single Job with Time Windows
刘 敏, 曹庭锴, 张同全
应用数学进展Vol.9 No.12, 全文下载: PDF HTML XML DOI:10.12677/AAM.2020.912251, December 18 2020
改进教学优化算法在柔性作业车间调度问题中的应用Application of Improved Teaching-Learning-Based Optimization Algorithm in Flexible Job-Shop Scheduling Problem
陈其炜
建模与仿真Vol.12 No.6, 全文下载: PDF HTML XML DOI:10.12677/MOS.2023.126530, November 29 2023
多目标Jaya算法求解节能柔性作业车间调度问题Multi-Objective Jaya Algorithm for Solving Energy-Saving Flexible Job Shop Scheduling Problem
张德尚, 李仁旺 国家自然科学基金支持
建模与仿真Vol.12 No.3, 全文下载: PDF HTML XML DOI:10.12677/MOS.2023.123171, May 8 2023
基于L-M优化BP神经网络的风电功率预测The Capacity Prediction for the Wind Power Based on L-M Optimized BP Algorithm
孟静, 黄元峰
智能电网Vol.2 No.2, 全文下载: PDF HTML DOI:10.12677/sg.2012.22007, June 26 2012
同类机上工件实时到达在线排序问题Online Scheduling Problem for Jobs Arriving over Time on Related Machines
马丽娜, 李荣珩 科研立项经费支持
运筹与模糊学Vol.9 No.4, 全文下载: PDF HTML XML DOI:10.12677/ORF.2019.94032, November 5 2019