|
●
吴俊秀, 郭清. 大凌河流域MIKE BASIN水资源模型[J]. 水文, 2011, 31(1): 71-76.
WU, Jun-xiu, GUO, Qin...
|
|
●
KABIR, A., MAHDAVI, M., BAHREMAND, A., et al. Application of a geographical info...
|
|
●
YE, A. Z., DUAN, Q. Y., ZENG, H. Z., et al. A distributed time-variant gain hydr...
|
|
●
CHORMANSKI, J., VOORDE, T., ROECK, T., et al. Improving distributed runoff predi...
|
|
●
丁晶, 邓育仁. 随机水文学[M]. 成都: 成都科技大学出版社, 1988.
DING Jing, DENG Yu-ren. Stochastic hydr...
|
|
●
黄强, 高凡, 张永永, 等. 乌江梯级水库群优化调度规律研究[J]. 水力发电学报. 2011, 30(4): 42-48.
HUANG Qiang, GA...
|
|
●
李承军, 陈毕胜, 张高峰. 水电站双线性调度规则研究[J]. 水力发电学报, 2005, 24(1): 11-15, 46.
LI Cheng-jun, C...
|
|
●
纪昌明, 苏学灵, 周婷, 等. 梯级水电站群调度函数的模型与评价[J]. 电力系统自动化, 2010, 34(3): 33-37.
JI Chang-min...
|
|
●
周研来, 郭生练, 刘德地. 混联水库群的双量调度函数研究[J]. 水力发电学报, 2013, 32(3): 55-61.
ZHOU Yan-lai, GUO...
|
|
●
孙秋戎, 陈森林, 董建凡, 等. 改进的RAGA在水库调度函数优化中的应用[J]. 中国农村水利水电, 2013, 9: 5-11.
SUN Qiu-ron...
|
|
●
刘攀, 郭生练, 张文选, 等. 梯级水库群联合优化调度函数研究[J]. 水科学进展, 2007, 18(6): 816-822.
LIU Pan, GUO...
|
|
●
YOUNG, G. K. Finding reservoir operating rules. Journal of Hydraulics Division, ...
|
|
●
程春田, 杨凤英, 武新宇, 等. 基于模拟逐次逼近算法的梯级水电站群优化调度图研究[J]. 水力发电学报, 2010, 29(6): 71-77.
CHEN...
|
|
●
吴成国, 王义民, 黄强, 等. 基于加速遗传算法的梯级水电站联合优化调度研究[J]. 水力发电学报, 2011, 30(6): 171-177.
WU Ch...
|
|
●
Moghaddam, I.G., Nick, M., Fallahi, F., Sanei, M. and Mortazavi, S. (2013) Risk-...
|
|
●
Handschin, E., Neise, F., Neumann, H. and Schultz, R. (2006) Optimal operation o...
|
|
●
Pandžić, H., Morales, J.M., Conejo, A.J. and Kuzle, I. (2013) Offering model for...
|
|
●
Foggia, G., et al. (2010) Optimization by stochastic programming for the aggrega...
|
|
●
Mohammadi, J., Rahimi-Kian, A. and Mohammad. S.G. (2011) Joint Operation of Wind...
|
|
●
Lombardi, P., Stotzer, M., Styczynski, Z. and Orths, A. (2011) Multi-criteria op...
|
|
●
Raab, A.F., Ferdowsi, M., Karfopoulos, E., Unda, I.G., Skarvelis-Kazakos, S., Pa...
|
|
●
Musio, M. and Damiano, A. (2012) Virtual Power Plant Management Model Based on E...
|
|
●
Sousa, T., Morais, H., Vale, Z., Faria, P. and Soares, J. (2012) Intelligent ene...
|
|
●
Musio, M., Lombardi, P. and Damiano, A. (2010) Vehicles to grid (V2G) concept ap...
|
|
●
Vasirani, M., Kota, R., Cavalcante, R., Ossowski, S. and Jennings, N. (2013) An ...
|
|
●
Pandžić, H., Kuzle, I. and Capuder, T. (2013) Virtual power plant mid-term dispa...
|
|
●
Houwing, M., Papaefthymiou, G., Heijnen, P.W. and Ilić, M.D. (2009) Balancing w...
|
|
●
Shropshire, D., Purvins, A., Papaioannou, I. and Maschio, I. (2012) Benefits and...
|
|
●
Peikherfeh, M., Seifi, H. and Sheikh-El-Eslami, M.K. (2011) Optimal dispatch of ...
|
|
●
Taheri, H., Ghasemi, H., Rahimi-Kian, A. and Akbari, T. (2011) Modeling and opti...
|