改进的MIKE BASIN在安吉两库引水工程中的应用
Application of Improved MIKE BASIN in the Two-Reservoir Diversion Project in Anji
DOI: 10.12677/jwrr.2025.144042, PDF,    科研立项经费支持
作者: 张徐杰, 朱 斌, 郭 靖, 徐郡璘:中国电建集团华东勘测设计研究院有限公司,浙江 杭州
关键词: 安吉两库引水工程MIKE BASIN水资源配置模型模拟Two-Reservoir Diversion Project in Anji MIKE BASIN Water Resources Allocation Model Simulation
摘要: 以安吉两库引水工程为案例,将Matlab与MIKE BASIN模型进行耦合,实现供水结果的保证率计算和模型调度参数的反复调整率定。利用1955~2016年逐月水文数据,对安吉两库引水工程的可外调水量进行研究。结果表明,安吉两库在满足本地各项用水的前提下有多余水量可外调至湖州市区。湖州市区满足90%保证率的引水规模为23.0万m3/d,对应多年平均引水量为5694万m3。如引水保证率进一步降低,则引水规模可进一步增大,对应多年平均引水量也相应增加。但模型只能在用户设定的水资源配置规则下展开计算,需进一步探索将优化算法用于模型的配置规则设定,以寻找理论上的最优方案。
Abstract: Based on the hydrological data from 1955 to 2016, this paper applied improved MIKE BASIN model coupled with Matlab to simulate the water resources allocation in the Two-reservoir Diversion Project in Anji, aiming to investigate the potential water volume to be diverted. The results indicated that, on the premise of the local water demands in Anji being met, the diversion water discharge to Huzhou was 230 thousand cubic meters per day with a guaranteed rate of 90%. The corresponding annual diversion water volume was 56.94 million cubic meters. If the guaranteed rate decreased, the diversion water discharge and annual diversion water volume could be increased. In addition, the water resources could only be allocated under the rules set by users, and further studies such as applying optimization algorithm in making allocation rules need to be investigated to find the theoretical optimal solution.
文章引用:张徐杰, 朱斌, 郭靖, 徐郡璘. 改进的MIKE BASIN在安吉两库引水工程中的应用[J]. 水资源研究, 2025, 14(4): 390-397. https://doi.org/10.12677/jwrr.2025.144042

参考文献

[1] 游进军. 水资源系统模拟理论与实践[D]: [博士学位论文]. 北京: 中国水利水电科学研究院, 2005.
[2] VONK, E., XU, Y. P., BOOIJ, M. J., et al. Adapting multireservoir operation to shifting patterns of water supply and demand. Water Resources Management, 2014, 28(3): 625-643. [Google Scholar] [CrossRef
[3] JAMIESON, D. G., FEDRA, K. The “WaterWare” decision-support system for river-basin planning. 1. Conceptual design. Journal of Hydrology, 1996, 177(3-4): 163-175. [Google Scholar] [CrossRef
[4] IRESON, A., MAKROPOULOS, C. and MAKSIMOVIC, C. Water resources modelling under data scarcity: Coupling MIKE BASIN and ASM groundwater model. Water Resources Management, 2006, 20(4): 567-590. [Google Scholar] [CrossRef
[5] 吴俊秀, 郭清. 大凌河流域MIKE BASIN水资源模型[J]. 水文, 2011, 31(1): 70-75.
[6] 孙栋元, 卢书超, 李元红, 等. 基于MIKE BASIN的石羊河流域水资源管理模拟模型[J]. 水文, 2015, 35(6): 50-56.
[7] 熊飞, 耿丽娇. MIKE BASIN模型在本那河流域水资源配置中的应用[J]. 水科学与工程技术, 2024(4): 8-10.
[8] 刘金华, 郭靖, 张发鸿, 等. 基于Mike Basin的厦门市雨洪资源利用研究[J]. 水资源研究, 2021, 10(3): 322-330.
[9] 孔春梅, 连泽俭. MIKE BASIN在麻栗坝灌区水资源配置中的应用[J]. 水利经济, 2020, 38(6): 50-53+83.
[10] 徐国强. 老石坎和赋石两水库联合控制运用与效益分析[J]. 浙江水利科技, 1998(4): 10-12+65.
[11] 谢玉芝, 杨彦龙, 钟娜. 安吉“引水济湖”引水量分析[J]. 华东工程技术, 2012, 33(3): 12-14.