安全壳地坑过滤器碎渣源项的踏勘及结果评估方法
The Method of Debris Source Walkdown and Result Evaluation for Containment Sump Strainer
摘要:
地坑过滤器是核安审的重要审查专题,为评估其性能是否满足设计要求,需对核电厂安全壳内部进行踏勘以确定其潜在碎渣源项。本文结合NEI 02-01导则的要求与具体工程实践经验,介绍了针对国内新建核电厂安全壳地坑过滤器上游碎渣源项的踏勘方法,说明了准备踏勘前期工作的要求,阐述了各项碎渣源项与流道踏勘的实施方案,提出了踏勘结果的评估及处理方法。
Abstract:
Sump Strainer is an important topic of nuclear safety review. To evaluate its performance, walkdown survey is necessary to verify potential debris source inside the containment. Based on requirements of NEI 02-01 and engineering experience, this paper introduces the method of debris source walkdown for containment sump strainers in Chinese newly built nuclear power plant, describes the requirements for walkdown preparation work, expounds specific implementation programs for different debris sources and flow path, and puts forward the evaluation and treatment method of walkdown result.
参考文献
|
[1]
|
US.NRC. NEI 04-07. (2004) Pressurized Water Reactor Sump Performance Evaluation Methodology. U.S. NRC, Washington DC.
|
|
[2]
|
张卫, 龚钊, 朱京梅, 等. 秦山核电二期扩建工程安全壳地坑过滤器设计改进及遗留问题分析[J]. 核动力工程, 2013, 34(6): 128-131.
|
|
[3]
|
US.NRC. GSI-191. (2002) Technical Assessment: Parametric Evaluations for Pressurized Water Reactor Recirculation Sump Performance. U.S. NRC, Vol. 1, Washington DC.
|
|
[4]
|
刘宇, 张庆华, 李春. 核电厂安全壳地坑滤网堵塞问题的机理分析[J]. 核安全, 2008(3): 52-56.
|
|
[5]
|
陈俊. 基于CFD模型的安全壳地坑过滤器上游分析工作[J]. 中国科技信息, 2015(2): 28-30.
|
|
[6]
|
赵延辉. CPR1000核电厂地坑滤网潜在堵塞问题解决方案研究及工程实施[D]: [硕士学位论文]. 上海: 上海交通大学, 2015.
|
|
[7]
|
王庆礼, 李海伦, 韩志航, 等. CPR1000安全壳地坑滤网上游分析[J]. 核科学与工程, 2010(30): 203-210.
|
|
[8]
|
US.NRC. NEI 02-01. (2002) Condition Assessment Guidelines: Debris Sources inside PWR Contain-ments. U.S. NRC, Washington DC.
|
|
[9]
|
李春, 依岩, 刘宇, 等. 压水堆核电厂安全壳内碎渣源的踏勘方法介绍[J]. 核安全, 2010(2): 25-29.
|