乌东德水电站近坝区涉水测量方案设计
Design of Wading Survey Scheme at the near Wudongde Reservoir Dam Region
摘要: 施工期的水利工程涉水测量项目具有大流量、高流速、岸线高危复杂、交通困难等特点,对仪器设备、技术指标、质量标准等方面均提出了较高的要求。优化设计了实用的涉水测量方案,配备了新仪器新技术,改进了测量方法。结合乌东德水电站近坝区涉水测量的应用,验证了该方案的可行性,为施工期的水利工程空间数据获取技术方案提供经验借鉴。
Abstract: Wading survey of water conservancy project in construction period as such characteristics as large and high flow rates, high risk of coastline, complex traffic and so on, requires more instruments and equipment, technical indexes and high-quality standards. The practical scheme of wading measurement is optimized and equipped with new instruments and technologies, and the measurement method is improved. Combined with the application of Wudongde reservoir near the dam area of wading survey, the feasibility of the survey program is verified which can provide reference for water conservancy project construction period of the spatial data acquisition technology.
文章引用:王进, 陈细润, 董章内, 宋小燕. 乌东德水电站近坝区涉水测量方案设计[J]. 水资源研究, 2019, 8(6): 618-623. https://doi.org/10.12677/JWRR.2019.86070

参考文献

[1] 彭圣华, 牛圣宽, 罗玉华, 等. 乌东德水电站对外交通公路运输方案规划研究[J]. 人民长江, 2014(20): 85-87. PENG Shenghua, NIU Shengkuan, LUO Yuhua, et al. Planning on highway transportation program of external traffic for Wudongde Hydropower Station. Yangtze River, 2014(20): 85-87. (in Chinese)
[2] 邓小川, 范自力. 乌东德水电站首级施工控制网测量及若干关键技术[J]. 四川水力发电, 2011, 30(3): 99-102. DENG Xiaochuan, FAN Zili. Survey and key technologies of primary construction control network of Wudongde Hydropower Station. Sichuan Water Power, 2011, 30(3): 99-102. (in Chinese)
[3] 刘彦杰, 刘祖强. 乌东德水电站对外公路控制测量坐标系选择研究[J]. 人民长江, 2008, 39(6): 74-76. Liu Yanqiang, Liu Zuqiang. Study on selection of coordinate system for outer highway control survey of Wudongde Hydropower Station. Yangtze River, 2008, 39(6): 74-76. (in Chinese)
[4] 廖仁强, 李伟, 向光红. 乌东德水电站枢纽布置方案研究[J]. 人民长江, 2009, 40(23): 5-7. LIAO Renqiang, LI Wei and XIANG Guanghong. Research on layout of Wudongde Hydropower Station. Yangtze River, 2009, 40(23): 5-7. (in Chinese)
[5] 杜正乔, 贾洪英. 金沙江乌东德水电站导流洞开挖控制测量的布设及应用[J]. 西北水电, 2015(4): 27-30. DU Zhengqiao, JIA Hongying. Arrangement and application of control survey of excavation of diversion tunnel, Wudongde Hydropower Project. Northwest Hydropower, 2015(4): 27-30. (in Chinese)
[6] 钮新强, 石伯勋, 翁永红. 金沙江乌东德水电站设计重大技术问题研究[J]. 人民长江, 2014(20): 1-7. NIU Xinqiang, SHI Boxun and WENG Yonghong. Comprehensive research on key technical issues of Wudongde Hydropower Station on Jinsha River. Yangtze River, 2014(20): 1-7. (in Chinese)
[7] SL257-2017. 水道观测规范[S]. 北京: 中国水利水电出版社. SL257-2017. Specifications for water survey. Beijing: China Water Power Press. (in Chinese)
[8] 章书寿, 陈福山. 测量学教程[M]. 北京: 测绘出版社, 2006: 251-275. ZHANG Shushou, CHEN Fushan. Surveying course. Beijing: Surveying and Mapping Publishing House, 2006: 251-275. (in Chinese)
[9] 孙振勇, 李俊, 张燕. 基于GPS无验潮水深测量在自然河段冲淤变化的精度探讨[J]. 北京测绘, 2016(2): 87-93. SUN Zhenyong, LI Jun and ZHANG Yan. Application of GPS bathymetric survey technique without tidal observation in scour and silting of sediment in Yangtze natural reach. Beijing Surveying & Mapping, 2016(2): 87-93. (in Chinese)
[10] 孙振勇, 任勇, 刘杰, 等. 三维激光扫描技术在灾害抢险中的应用比较研究[J]. 北京测绘, 2016(5): 109-112. SUN Zhenyong, REN Yong, LIU Jie, et al. A comparative study on application of 3D laser scanning technology in disaster rescue. Beijing Surveying & Mapping, 2016(5): 87-93. (in Chinese)