|
[1]
|
程永波, 陈洪转, 庄雪松, 等. 供应商参与航空复杂装备协同研制的实施策略[J]. 系统工程理论与实践, 2017, 37(6): 1568-1580.
|
|
[2]
|
Wang, H., Fang, Z., Wang, D. and Liu, S. (2020) An Integrated Fuzzy QFD and Grey Decision-Making Approach for Supply Chain Collaborative Quality Design of Large Complex Products. Computers & Industrial Engineering, 140, Article 106212. [Google Scholar] [CrossRef]
|
|
[3]
|
Utterback, J.M. and Abernathy, W.J. (1975) A Dynamic Model of Process and Product Innovation. Omega, 3, 639-656. [Google Scholar] [CrossRef]
|
|
[4]
|
Qi, Y., Mao, Z., Zhang, M. and Guo, H. (2020) Manufacturing Practices and Servitization: The Role of Mass Customization and Product Innovation Capabilities. International Journal of Production Economics, 228, Article 107747. [Google Scholar] [CrossRef]
|
|
[5]
|
Cherrafi, A., Garza-Reyes, J.A., Kumar, V., Mishra, N., Ghobadian, A. and Elfezazi, S. (2018) Lean, Green Practices and Process Innovation: A Model for Green Supply Chain Performance. International Journal of Production Economics, 206, 79-92. [Google Scholar] [CrossRef]
|
|
[6]
|
Du, B., Tan, T., Guo, J., Li, Y. and Guo, S. (2021) Energy-Cost-Aware Resource-Constrained Project Scheduling for Complex Product System with Activity Splitting and Recombining. Expert Systems with Applications, 173, Article 114754. [Google Scholar] [CrossRef]
|
|
[7]
|
Li, R., Yang, N., Zhang, Y. and Liu, H. (2020) Risk Propagation and Mitigation of Design Change for Complex Product Development (CPD) Projects Based on Multilayer Network Theory. Computers & Industrial Engineering, 142, Article 106370. [Google Scholar] [CrossRef]
|
|
[8]
|
Li, R., Yang, N., Zhang, Y., Liu, H. and Zhang, M. (2021) Impacts of Module-Module Aligned Patterns on Risk Cascading Propagation in Complex Product Development (CPD) Interdependent Networks. Physica A: Statistical Mechanics and Its Applications, 564, Article 125531. [Google Scholar] [CrossRef]
|
|
[9]
|
Huang, X., Chen, H., Ma, P., Wang, W., Cai, X. and Nafis, M. (2021) A Two-Sided Matching Model for Complex Equipment Production of Military-Civilian Merging Platform with Reference Effects. Soft Computing, 25, 10399-10421. [Google Scholar] [CrossRef]
|
|
[10]
|
Hobday, M. (1998) Product Complexity, Innovation and Industrial Organisation. Research Policy, 26, 689-710. [Google Scholar] [CrossRef]
|
|
[11]
|
Wagner, S.M. (2012) Tapping Supplier Innovation. Journal of Supply Chain Management, 48, 37-52. [Google Scholar] [CrossRef]
|
|
[12]
|
Petersen, K.J., Handfield, R.B. and Ragatz, G.L. (2004) Supplier Integration into New Product Development: Coordinating Product, Process and Supply Chain Design. Journal of Operations Management, 23, 371-388. [Google Scholar] [CrossRef]
|
|
[13]
|
Clark, K.B. (1989) Project Scope and Project Performance: The Effect of Parts Strategy and Supplier Involvement on Product Development. Management Science, 35, 1247-1263. [Google Scholar] [CrossRef]
|
|
[14]
|
宋欣. 复杂产品设计知识模型构建及其重用方法研究[D]: [博士学位论文]. 天津: 天津大学, 2009.
|
|
[15]
|
Clark, K.B. and Fujimoto, T. (1989) Lead Time in Automobile Product Development Explaining the Japanese Advantage. Journal of Engineering and Technology Management, 6, 25-58. [Google Scholar] [CrossRef]
|
|
[16]
|
Gupta, A.K. and Souder, W.E. (1998) Key Drivers of Reduced Cycle Time. Research-Technology Management, 41, 38-43. [Google Scholar] [CrossRef]
|
|
[17]
|
Feng, T., Sun, L. and Zhang, Y. (2010) The Effects of Customer and Supplier Involvement on Competitive Advantage: An Empirical Study in China. Industrial Marketing Management, 39, 1384-1394. [Google Scholar] [CrossRef]
|
|
[18]
|
LaBahn, D.W. and Krapfel, R. (2000) Early Supplier Involvement in Customer New Product Development: A Contingency Model of Component Supplier Intentions. Journal of Business Research, 47, 173-190. [Google Scholar] [CrossRef]
|
|
[19]
|
Nair, A., Jayaram, J. and Das, A. (2015) Strategic Purchasing Participation, Supplier Selection, Supplier Evaluation and Purchasing Performance. International Journal of Production Research, 53, 6263-6278. [Google Scholar] [CrossRef]
|
|
[20]
|
Krishnan, V., Eppinger, S.D. and Whitney, D.E. (1993). Iterative Overlapping: Accelerating Product Development by Preliminary Information Exchange. 5th International Conference on Design Theory and Methodology, Albuquerque, 19-22 September 1993, 223-231.[CrossRef]
|
|
[21]
|
Liang, C.H., Hong, Z. and Jian, Z. (2011) Integrated Optimization Approach for Production-Distribution Planning in Supply Chain. Control and Decision, 26, 27-31.
|
|
[22]
|
Fu, B., Huo, Y. and Zhao, H. (2012) Coordinated Scheduling of Production and Delivery with Production Window and Delivery Capacity Constraints. Theoretical Computer Science, 422, 39-51. [Google Scholar] [CrossRef]
|
|
[23]
|
Ullrich, C.A. (2013) Integrated Machine Scheduling and Vehicle Routing with Time Windows. European Journal of Operational Research, 227, 152-165. [Google Scholar] [CrossRef]
|
|
[24]
|
Fu, L., Aloulou, M.A. and Triki, C. (2017) Integrated Production Scheduling and Vehicle Routing Problem with Job Splitting and Delivery Time Windows. International Journal of Production Research, 55, 5942-5957. [Google Scholar] [CrossRef]
|
|
[25]
|
Kong, L., Li, H., Luo, H., Ding, L., Luo, X. and Skitmore, M. (2017) Optimal Single-Machine Batch Scheduling for the Manufacture, Transportation and JIT Assembly of Precast Construction with Changeover Costs within Due Dates. Automation in Construction, 81, 34-43. [Google Scholar] [CrossRef]
|
|
[26]
|
Noroozi, A., Mazdeh, M.M., Heydari, M. and Rasti-Barzoki, M. (2018) Coordinating Order Acceptance and Integrated Production-Distribution Scheduling with Batch Delivery Considering Third Party Logistics Distribution. Journal of Manufacturing Systems, 46, 29-45. [Google Scholar] [CrossRef]
|
|
[27]
|
Solomon, M.M. and Desrosiers, J. (1988) Survey Paper—Time Window Constrained Routing and Scheduling Problems. Transportation Science, 22, 1-13. [Google Scholar] [CrossRef]
|
|
[28]
|
Qureshi, A.G., Taniguchi, E. and Yamada, T. (2009) An Exact Solution Approach for Vehicle Routing and Scheduling Problems with Soft Time Windows. Transportation Research Part E: Logistics and Transportation Review, 45, 960-977. [Google Scholar] [CrossRef]
|
|
[29]
|
马文建, 刘伟, 李传昭. 并行产品开发中设计活动间重叠与信息交流[J]. 计算机集成制造系统, 2008(4): 630-636.
|
|
[30]
|
陈洪转, 刘思峰, 何利芳. “主制造商-供应商”协同主体双重努力最优合作协调[J]. 系统工程, 2012, 30(7): 31-34.
|
|
[31]
|
Van den Broeke, M. and Paparoidamis, N. (2021) Engaging in or Escaping Co-Creation? An Analytical Model. International Journal of Production Economics, 231, Article 107917. [Google Scholar] [CrossRef]
|