基于Midas Gen的某超高层结构施工过程分析
Analysis of the Construction Process of a Super High-Rise Structure Based on Midas Gen
DOI: 10.12677/mos.2024.136525, PDF,   
作者: 李雁阳, 李义磊:上海理工大学环境与建筑学院,上海
关键词: 超高层结构施工模拟收缩徐变Super High-Rise Structure Construction Simulation Shrinkage Creep
摘要: 本文以某高度为202.9 m的超高层结构为背景,基于Midas gen结构仿真软件,对比分析了施工过程对结构变形的影响,混凝土的收缩徐变在超高层结构施工过程中的影响以及竣工十年后收缩徐变效应对结构的影响。研究表明:超高层结构分析时必须考虑施工过程,混凝土收缩徐变效应使得超高层结构产生较大的竖向位移,并且随着时间的增长,收缩徐变所产生的影响越大。
Abstract: This paper takes a super high-rise structure with a height of 202.9 m as the background, based on the Midas GEN structural simulation software, and compares the impact of the construction process on structural deformation, the impact of concrete shrinkage and creep during the construction process of super high-rise structures, and the impact of shrinkage and creep on the structure ten years after completion. The study shows that: the construction process must be considered in the analysis of super high-rise structures, shrinkage and creep cause significant vertical displacement in super high-rise structures, and the impact of shrinkage and creep increases with time.
文章引用:李雁阳, 李义磊. 基于Midas Gen的某超高层结构施工过程分析[J]. 建模与仿真, 2024, 13(6): 5775-5780. https://doi.org/10.12677/mos.2024.136525

参考文献

[1] 汪大绥, 包联进. 我国超高层建筑结构发展与展望[J]. 建筑结构, 2019, 49(19): 11-24.
[2] 丁洁民, 吴宏磊, 赵昕. 我国高度250 m以上超高层建筑结构现状与分析进展[C]//第三届建筑结构基础理论与创新实践学术论坛. 第三届建筑结构基础理论与创新实践学术论坛论文集. 长沙: 中国建筑学会, 《建筑结构学报》, 湖南大学, 2014: 1-7.
[3] 吴玖荣, 吴立友, 梁强武. 竖向布置沿高度内编的某超高层建筑施工模拟分析[J]. 建筑结构, 2020, 50(5): 71-76, 49.
[4] 傅学怡, 吴兵, 陈贤川, 等. 卡塔尔某超高层建筑结构设计研究综述[J]. 建筑结构学报, 2008, 29(1): 1-9, 15.
[5] 赵建, 周定松, 周佳, 等. 混凝土收缩徐变对超高层巨型混合结构竖向变形和关键构件内力的影响与控制[J]. 建筑结构, 2020, 50(1): 44-51.
[6] 王忠良, 刘德辉, 郭智华, 等. 考虑混凝土收缩徐变的超高层复杂结构施工全过程模拟[J]. 建筑结构, 2023, 53(11): 137-142.
[7] 王化杰, 钱宏亮, 范峰, 等. 京基金融中心施工全过程跟踪研究[J]. 哈尔滨工业大学学报, 2015, 47(6): 15-20.
[8] 韩伟威, 吕毅刚. 混凝土收缩徐变预测模型试验研究[J]. 中南大学学报(自然科学版), 2016, 47(10): 3515-3522.