煤制油粉煤仓泄压面积设计Design of Pressure Relief Area of Pulverized Coal Bunker in Coal-to-Oil Enterprise
姚 敏, 郭中山, 袁红年 科研立项经费支持
矿山工程Vol.5 No.3, 全文下载: PDF HTML XML DOI:10.12677/ME.2017.53007, June 29 2017
Jhajjar电厂660 MW机组燃烧试验研究The Combustion Adjustment Research on 660 MW Unit of Jhajjar Power Plant
张开利
清洁煤与能源Vol.2 No.2, 全文下载: PDF HTML DOI:10.12677/CCE.2014.22004, June 23 2014
高职院校技能抽测考核标准及评价标准制定研究——以黑龙江农业经济职业学院为例Research on the Formulation of Assessment Standards and Evaluation Standards for Skill Sampling Test in Higher Vocational Colleges—Taking Heilongjiang Agricultural Economy Vocational College as an Example
赵树敏, 吴 英, 肖文博, 于瀛军 科研立项经费支持
职业教育Vol.12 No.4, 全文下载: PDF HTML XML DOI:10.12677/VE.2023.124071, July 14 2023
煤制油煤粉爆炸特性实验研究Experimental Study on Pulverized Coal Explosion Characteristics of Coal-to-Oil
姚 敏, 黄 斌, 汤卫林 科研立项经费支持
矿山工程Vol.5 No.3, 全文下载: PDF HTML XML DOI:10.12677/ME.2017.53006, June 29 2017
面向煤炭清洁利用的港口煤垛含水率预测研究Research on Forecast of Moisture Content of Port Coal Stacks for Clean Coal Utilization
刘强, 李娜, 张淼, 李昊, 张崇进, 张帆 科研立项经费支持
清洁煤与能源Vol.9 No.1, 全文下载: PDF HTML XML DOI:10.12677/CCE.2021.91001, March 24 2021
磨煤机河曲电厂差压料位计改造介绍Hequ Power Plant Coal Mill Differential Pressure Level Meter
高晓东
电力与能源进展Vol.5 No.1, 全文下载: PDF HTML XML DOI:10.12677/AEPE.2017.51002, February 23 2017