彭杨, 李义天, 谢葆玲, 等. 三峡水库汛后提前蓄水方案研究[J]. 水力发电学报, 2002(3): 12-20.
PENG Yang, LI Yitian, XIE Baoling, et al. Study on an ahead of schedule impounding scheme of the Three Gorges Project (TGP) in the flood recession period. Journal of Hydroelectric Engineering, 2002(3): 12-20. (in Chinese)